0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Moon, Hyounseok / Kamat, Vineet R. / Kang, LeenSeok (2014): Grid Cell-based Algorithm for Workspace Overlapping Analysis Considering Multiple Allocations of Construction Resources. Dans: Journal of Asian Architecture and Building Engineering, v. 13, n. 2 (mai 2014).

    https://doi.org/10.3130/jaabe.13.341

  2. Kang, LeenSeok / Pyeon, Jaeho / Moon, Hyounseok / Kim, ChangHak / Kang, Minsu (2013): Development of Improved 4D CAD System for Horizontal Works in Civil Engineering Projects. Dans: Journal of Computing in Civil Engineering, v. 27, n. 3 (mai 2013).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000216

  3. Moon, Hyounseok / Kim, HyeonSeung / Kamat, Vineet R. / Kang, LeenSeok (2015): BIM-Based Construction Scheduling Method Using Optimization Theory for Reducing Activity Overlaps. Dans: Journal of Computing in Civil Engineering, v. 29, n. 3 (mai 2015).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000342

  4. Kim, Hyunjoo / Shen, Zhenhua / Moon, Hyounseok / Ju, Kibum / Choi, Wonsik (2015): Developing a 3D intelligent object model for the application of construction planning/simulation in a highway project. Dans: KSCE Journal of Civil Engineering, v. 20, n. 2 (avril 2015).

    https://doi.org/10.1007/s12205-015-0463-4

  5. Kim, Hyunjoo / Orr, Kevin / Shen, Zhenhua / Moon, Hyounseok / Ju, Kibum / Choi, Wonsik (2014): Highway Alignment Construction Comparison Using Object-Oriented 3D Visualization Modeling. Dans: Journal of Construction Engineering and Management, v. 140, n. 10 (octobre 2014).

    https://doi.org/10.1061/(asce)co.1943-7862.0000898

  6. Moon, Hyounseok / Kim, HyeonSeung / Kim, ChangHak / Kang, LeenSeok (2014): Development of a schedule-workspace interference management system simultaneously considering the overlap level of parallel schedules and workspaces. Dans: Automation in Construction, v. 39 (avril 2014).

    https://doi.org/10.1016/j.autcon.2013.06.001

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine