Hyounseok Moon
- Grid Cell-based Algorithm for Workspace Overlapping Analysis Considering Multiple Allocations of Construction Resources. In: Journal of Asian Architecture and Building Engineering, v. 13, n. 2 (Mai 2014). (2014):
- Development of Improved 4D CAD System for Horizontal Works in Civil Engineering Projects. In: Journal of Computing in Civil Engineering, v. 27, n. 3 (Mai 2013). (2013):
- BIM-Based Construction Scheduling Method Using Optimization Theory for Reducing Activity Overlaps. In: Journal of Computing in Civil Engineering, v. 29, n. 3 (Mai 2015). (2015):
- Developing a 3D intelligent object model for the application of construction planning/simulation in a highway project. In: KSCE Journal of Civil Engineering, v. 20, n. 2 (April 2015). (2015):
- Highway Alignment Construction Comparison Using Object-Oriented 3D Visualization Modeling. In: Journal of Construction Engineering and Management, v. 140, n. 10 (Oktober 2014). (2014):
- Development of a schedule-workspace interference management system simultaneously considering the overlap level of parallel schedules and workspaces. In: Automation in Construction, v. 39 (April 2014). (2014):