0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Taghaddos, Maedeh / Mousaei, Ali / Taghaddos, Hosein / Hermann, Ulrich / Mohamed, Yasser / AbouRizk, Simaan (2024): Optimized variable resource allocation framework for scheduling of fast-track industrial construction projects. Dans: Automation in Construction, v. 158 (février 2024).

    https://doi.org/10.1016/j.autcon.2023.105208

  2. Fagiar, Muaz / Mohamed, Yasser / AbouRizk, Simaan (2023): Simulation-Assisted Project Data Integration for Development and Analysis of As-Built Schedules. Dans: Buildings, v. 13, n. 4 (24 mars 2023).

    https://doi.org/10.3390/buildings13040974

  3. Alawi, Mubarak K. Al / Mohamed, Yasser (2021): A Review of Validation Methods in Construction Simulations Studies. Dans: International Journal of Structural and Civil Engineering Research, v. 10, n. 1 ( 2021).

    https://doi.org/10.18178/ijscer.10.1.43-47

  4. Mohsen, Osama / Petre, Cristian / Mohamed, Yasser (2023): Machine-Learning Approach to Predict Total Fabrication Duration of Industrial Pipe Spools. Dans: Journal of Construction Engineering and Management, v. 149, n. 2 (février 2023).

    https://doi.org/10.1061/jcemd4.coeng-11973

  5. Taghaddos, Maedeh / Taghaddos, Hosein / Hermann, Ulrich / Mohamed, Yasser / AbouRizk, Simaan (2021): Hybrid multi-mode simulation and optimization for subarea scheduling in heavy industrial construction. Dans: Automation in Construction, v. 125 (mai 2021).

    https://doi.org/10.1016/j.autcon.2021.103616

  6. Mohamed, Yasser / Borrego, Davila / Francisco, Luis / Al‐Hussein, Mohamed / AbouRizk, Simaan / Hermann, Ulrich (2007): Simulation‐based scheduling of module assembly yards: case study. Dans: Engineering, Construction and Architectural Management, v. 14, n. 3 (mai 2007).

    https://doi.org/10.1108/09699980710744926

  7. Ebrahimy, Yasser / AbouRizk, Simaan M. / Fernando, Siri / Mohamed, Yasser (2011): Simulation modeling and sensitivity analysis of a tunneling construction project's supply chain. Dans: Engineering, Construction and Architectural Management, v. 18, n. 5 (septembre 2011).

    https://doi.org/10.1108/09699981011074600

  8. Liu, Yang / Mohamed, Yasser (2012): Modelling industrial construction operations using a multi‐agent resource allocation framework. Dans: Engineering, Construction and Architectural Management, v. 19, n. 4 (juin 2012).

    https://doi.org/10.1108/09699981211237111

  9. Martinez, Pablo / Mohamed, Emad / Mohsen, Osama / Mohamed, Yasser (2020): Comparative Study of Data Mining Models for Prediction of Bridge Future Conditions. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 34, n. 1 (février 2020).

    https://doi.org/10.1061/(asce)cf.1943-5509.0001395

  10. Shahin, Adham / AbouRizk, Simaan M. / Mohamed, Yasser (2013): A Weather Generator for Use in Construction Simulation Models. Dans: International Journal of Architecture Engineering and Construction, v. 2, n. 2 (juin 2013).

    https://doi.org/10.7492/ijaec.2013.008

  11. Hammad, Ahmed / AbouRizk, Simaan / Mohamed, Yasser (2014): Application of KDD Techniques to Extract Useful Knowledge from Labor Resources Data in Industrial Construction Projects. Dans: Journal of Management in Engineering (ASCE), v. 30, n. 6 (novembre 2014).

    https://doi.org/10.1061/(asce)me.1943-5479.0000280

  12. Song, Lingguang / Mohamed, Yasser / AbouRizk, Simaan M. (2009): Early Contractor Involvement in Design and Its Impact on Construction Schedule Performance. Dans: Journal of Management in Engineering (ASCE), v. 25, n. 1 (janvier 2009).

    https://doi.org/10.1061/(asce)0742-597x(2009)25:1(12)

  13. Taghaddos, Hosein / Hermann, Ulrich / AbouRizk, Simaan / Mohamed, Yasser (2014): Simulation-Based Multiagent Approach for Scheduling Modular Construction. Dans: Journal of Computing in Civil Engineering, v. 28, n. 2 (mars 2014).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000262

  14. Hu, Di / Mohamed, Yasser (2014): Simulation-Model-Structuring Methodology for Industrial Construction Fabrication Shops. Dans: Journal of Construction Engineering and Management, v. 140, n. 5 (mai 2014).

    https://doi.org/10.1061/(asce)co.1943-7862.0000825

  15. ElNimr, Amr / Fagiar, Muaz / Mohamed, Yasser (2016): Two-way integration of 3D visualization and discrete event simulation for modeling mobile crane movement under dynamically changing site layout. Dans: Automation in Construction, v. 68 (août 2016).

    https://doi.org/10.1016/j.autcon.2016.05.013

  16. Hu, Di / Mohamed, Yasser (2014): A dynamic programming solution to automate fabrication sequencing of industrial construction components. Dans: Automation in Construction, v. 40 (avril 2014).

    https://doi.org/10.1016/j.autcon.2013.12.013

  17. Al-alawi, Mubarak / Bouferguene, Ahmed / Mohamed, Yasser (2017): Non-parametric weather generator for modelling construction operations: Comparison with the parametric approach and evaluation of construction-based impacts. Dans: Automation in Construction, v. 75 (mars 2017).

    https://doi.org/10.1016/j.autcon.2016.11.014

  18. Wang, Ping / Mohamed, Yasser / AbouRizk, Simaan M. / Rawa, A. R. Tony (2009): Flow Production of Pipe Spool Fabrication: Simulation to Support Implementation of Lean Technique. Dans: Journal of Construction Engineering and Management, v. 135, n. 10 (octobre 2009).

    https://doi.org/10.1061/(asce)co.1943-7862.0000068

  19. Agbulos, Albert / Mohamed, Yasser / Al-Hussein, Mohamed / AbouRizk, Simaan / Roesch, John (2006): Application of Lean Concepts and Simulation Analysis to Improve Efficiency of Drainage Operations Maintenance Crews. Dans: Journal of Construction Engineering and Management, v. 132, n. 3 (mars 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:3(291)

  20. Chung, Tae Hwan / Mohamed, Yasser / AbouRizk, Simaan (2006): Bayesian Updating Application into Simulation in the North Edmonton Sanitary Trunk Tunnel Project. Dans: Journal of Construction Engineering and Management, v. 132, n. 8 (août 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:8(882)

  21. Hu, Di / Mohamed, Yasser / Taghaddos, Hosein / Hermann, Ulrich (Rick) (2017): A simulation-based method for effective workface planning of industrial construction projects. Dans: Construction Management and Economics, v. 36, n. 6 (octobre 2017).

    https://doi.org/10.1080/01446193.2017.1390241

  22. Bayzid, Sharif Mohammad / Mohamed, Yasser / Al-Hussein, Maria (2016): Prediction of maintenance cost for road construction equipment: a case study. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 43, n. 5 (mai 2016).

    https://doi.org/10.1139/cjce-2014-0500

  23. Saba, Farzaneh / Mohamed, Yasser (2013): An ontology-driven framework for enhancing reusability of distributed simulation modeling of industrial construction processes. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 40, n. 9 (septembre 2013).

    https://doi.org/10.1139/cjce-2011-0489

  24. Tian, Xueying / Mohamed, Yasser / AbouRizk, Simaan (2010): Simulation-based aggregate planning of batch plant operations. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 37, n. 10 (octobre 2010).

    https://doi.org/10.1139/l10-071

  25. Ali, Mostafa / Mohamed, Yasser (2018): A Framework for Visualizing Heterogeneous Construction Data Using Semantic Web Standards. Dans: Advances in Civil Engineering, v. 2018 ( 2018).

    https://doi.org/10.1155/2018/8370931

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine