Milad Memarzadeh
- Hidden-Model Processes for Adaptive Management under Uncertain Climate Change. Dans: Journal of Infrastructure Systems, v. 23, n. 4 (décembre 2017). (2017):
- Integrated Inspection Scheduling and Maintenance Planning for Infrastructure Systems. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 31, n. 6 (mai 2016). (2016):
- Model-free reinforcement learning with model-based safe exploration: Optimizing adaptive recovery process of infrastructure systems. Dans: Structural Safety, v. 80 (septembre 2019). (2019):
- Optimal Planning and Learning in Uncertain Environments for the Management of Wind Farms. Dans: Journal of Computing in Civil Engineering, v. 29, n. 5 (septembre 2015). (2015):
- Using two-way ANOVA and hypothesis test in evaluating crumb rubber modification (CRM) agitation effects on rheological properties of bitumen. Dans: Construction and Building Materials, v. 25, n. 4 (avril 2011). (2011):
- Interpreting SuperPAVE PG test results with confidence intervals. Dans: Construction and Building Materials, v. 25, n. 6 (juin 2011). (2011):
- Automated 2D detection of construction equipment and workers from site video streams using histograms of oriented gradients and colors. Dans: Automation in Construction, v. 32 (juillet 2013). (2013):