Milad Memarzadeh
- Hidden-Model Processes for Adaptive Management under Uncertain Climate Change. In: Journal of Infrastructure Systems, v. 23, n. 4 (Dezember 2017). (2017):
- Integrated Inspection Scheduling and Maintenance Planning for Infrastructure Systems. In: Computer-Aided Civil and Infrastructure Engineering, v. 31, n. 6 (Mai 2016). (2016):
- Model-free reinforcement learning with model-based safe exploration: Optimizing adaptive recovery process of infrastructure systems. In: Structural Safety, v. 80 (September 2019). (2019):
- Optimal Planning and Learning in Uncertain Environments for the Management of Wind Farms. In: Journal of Computing in Civil Engineering, v. 29, n. 5 (September 2015). (2015):
- Using two-way ANOVA and hypothesis test in evaluating crumb rubber modification (CRM) agitation effects on rheological properties of bitumen. In: Construction and Building Materials, v. 25, n. 4 (April 2011). (2011):
- Interpreting SuperPAVE PG test results with confidence intervals. In: Construction and Building Materials, v. 25, n. 6 (Juni 2011). (2011):
- Automated 2D detection of construction equipment and workers from site video streams using histograms of oriented gradients and colors. In: Automation in Construction, v. 32 (Juli 2013). (2013):