0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Søren Munch Lindhard ORCID

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Salhab, Diana / Lindhard, Søren Munch / Hamzeh, Farook (2024): Simulation-Based Approximation of the Gain from Applying Overlapping Activities. Dans: Journal of Construction Engineering and Management, v. 150, n. 4 (avril 2024).

    https://doi.org/10.1061/jcemd4.coeng-14166

  2. Lindhard, Søren Munch / Heidemann Lassen, Astrid / Cheng, Yang / Musso, Matteo / Wang, Geng / Bai, Shaoping: The potential of exoskeletons in construction: barriers and challenges. Dans: Construction Innovation.

    https://doi.org/10.1108/ci-08-2022-0206

  3. Salhab, Diana / Lindhard, Søren Munch / Hamzeh, Farook: Schedule compression and emerging waste in construction: an assessment of overlapping activities. Dans: Engineering, Construction and Architectural Management.

    https://doi.org/10.1108/ecam-12-2022-1121

  4. Wyke, Simon / Lindhard, Søren Munch / Larsen, Jesper Kranker (2023): Using principal component analysis to identify latent factors affecting cost and time overrun in public construction projects. Dans: Engineering, Construction and Architectural Management, v. 31, n. 6 (février 2023).

    https://doi.org/10.1108/ecam-02-2022-0189

  5. Salhab, Diana / Møller, Dan Eggert / Lindhard, Søren Munch / Hamzeh, Farook / Randrup, Morten / Pilgaard, Anders (2022): Accounting for Variability: Identifying Critical Activities as a Supplement to the Critical Path. Dans: Journal of Construction Engineering and Management, v. 148, n. 5 (mai 2022).

    https://doi.org/10.1061/(asce)co.1943-7862.0002266

  6. Rodrigues, Monique Rieger / Lindhard, Søren Munch (2021): Benefits and challenges to applying IPD: experiences from a Norwegian mega-project. Dans: Construction Innovation, v. 23, n. 2 (septembre 2021).

    https://doi.org/10.1108/ci-03-2021-0042

  7. Hanif, Hashim / Khurshid, Muhammad Bilal / Lindhard, Søren Munch / Aslam, Zuhaib (2016): Impact of Variation Orders on Time and Cost in Mega Hydropower Projects of Pakistan. Dans: Journal of Construction in Developing Countries, v. 21, n. 2 ( 2016).

    https://doi.org/10.21315/jcdc2016.21.2.3

  8. Larsen, Maria Stoettrup Schioenning / Lindhard, Søren Munch / Brunoe, Thomas Ditlev / Nielsen, Kjeld / Larsen, Jesper Kranker (2019): Mass Customization in the House Building Industry: Literature Review and Research Directions. Dans: Frontiers in Built Environment, v. 5 (novembre 2019).

    https://doi.org/10.3389/fbuil.2019.00115

  9. Larsen, Jesper Kranker / Shen, Geoffrey Qiping / Lindhard, Søren Munch / Brunoe, Thomas Ditlev (2016): Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects. Dans: Journal of Management in Engineering (ASCE), v. 32, n. 1 (janvier 2016).

    https://doi.org/10.1061/(asce)me.1943-5479.0000391

  10. Larsen, Jesper Kranker / Lindhard, Søren Munch / Brunoe, Thomas Ditlev / Jensen, Kim Noergaard (2018): The Relation between Pre-planning, Commissioning and Enhanced Project Performance. Dans: Construction Economics and Building, v. 18, n. 2 (juin 2018).

    https://doi.org/10.5130/ajceb.v18i2.5762

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine