- Simulation-Based Approximation of the Gain from Applying Overlapping Activities. Dans: Journal of Construction Engineering and Management, v. 150, n. 4 (avril 2024). (2024):
- The potential of exoskeletons in construction: barriers and challenges. Dans: Construction Innovation. :
- Schedule compression and emerging waste in construction: an assessment of overlapping activities. Dans: Engineering, Construction and Architectural Management. :
- Using principal component analysis to identify latent factors affecting cost and time overrun in public construction projects. Dans: Engineering, Construction and Architectural Management, v. 31, n. 6 (février 2023). (2023):
- Accounting for Variability: Identifying Critical Activities as a Supplement to the Critical Path. Dans: Journal of Construction Engineering and Management, v. 148, n. 5 (mai 2022). (2022):
- Benefits and challenges to applying IPD: experiences from a Norwegian mega-project. Dans: Construction Innovation, v. 23, n. 2 (septembre 2021). (2021):
- Impact of Variation Orders on Time and Cost in Mega Hydropower Projects of Pakistan. Dans: Journal of Construction in Developing Countries, v. 21, n. 2 ( 2016). (2016):
- (2019): Mass Customization in the House Building Industry: Literature Review and Research Directions. Dans: Frontiers in Built Environment, v. 5 (novembre 2019).
- Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects. Dans: Journal of Management in Engineering (ASCE), v. 32, n. 1 (janvier 2016). (2016):
- The Relation between Pre-planning, Commissioning and Enhanced Project Performance. Dans: Construction Economics and Building, v. 18, n. 2 (juin 2018). (2018):