- Simulation-Based Approximation of the Gain from Applying Overlapping Activities. In: Journal of Construction Engineering and Management, v. 150, n. 4 (April 2024). (2024):
- The potential of exoskeletons in construction: barriers and challenges. In: Construction Innovation. :
- Schedule compression and emerging waste in construction: an assessment of overlapping activities. In: Engineering, Construction and Architectural Management. :
- Using principal component analysis to identify latent factors affecting cost and time overrun in public construction projects. In: Engineering, Construction and Architectural Management, v. 31, n. 6 (Februar 2023). (2023):
- Accounting for Variability: Identifying Critical Activities as a Supplement to the Critical Path. In: Journal of Construction Engineering and Management, v. 148, n. 5 (Mai 2022). (2022):
- Benefits and challenges to applying IPD: experiences from a Norwegian mega-project. In: Construction Innovation, v. 23, n. 2 (September 2021). (2021):
- Impact of Variation Orders on Time and Cost in Mega Hydropower Projects of Pakistan. In: Journal of Construction in Developing Countries, v. 21, n. 2 ( 2016). (2016):
- (2019): Mass Customization in the House Building Industry: Literature Review and Research Directions. In: Frontiers in Built Environment, v. 5 (November 2019).
- Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects. In: Journal of Management in Engineering (ASCE), v. 32, n. 1 (Januar 2016). (2016):
- The Relation between Pre-planning, Commissioning and Enhanced Project Performance. In: Construction Economics and Building, v. 18, n. 2 (Juni 2018). (2018):