Göran Lindahl
- (2023): Sensory Design in the Birth Environment: Learning from Existing Case Studies. Dans: Buildings, v. 13, n. 3 (26 février 2023).
- Innovations in Hospital Architecture. Dans: Construction Management and Economics. :
- Aggregation of factors causing cost overruns and time delays in large public construction projects. Trends and implications. Dans: Engineering, Construction and Architectural Management, v. 24, n. 3 (mai 2017). (2017):
- (2007): Cooperation in the Building Sector between Building Material Manufacturers and Contractors to Develop Products. Dans: Australasian Journal of Construction Economics and Building, v. 7, n. 2 (novembre 2007).
- Applying the dynamic capabilities framework in the case of a large public construction client. Dans: Construction Management and Economics, v. 35, n. 7 (avril 2016). (2016):