Göran Lindahl
- (2023): Sensory Design in the Birth Environment: Learning from Existing Case Studies. In: Buildings, v. 13, n. 3 (26 Februar 2023).
- Innovations in Hospital Architecture. In: Construction Management and Economics. :
- Aggregation of factors causing cost overruns and time delays in large public construction projects. Trends and implications. In: Engineering, Construction and Architectural Management, v. 24, n. 3 (Mai 2017). (2017):
- (2007): Cooperation in the Building Sector between Building Material Manufacturers and Contractors to Develop Products. In: Australasian Journal of Construction Economics and Building, v. 7, n. 2 (November 2007).
- Applying the dynamic capabilities framework in the case of a large public construction client. In: Construction Management and Economics, v. 35, n. 7 (April 2016). (2016):