- Research on prefabricated metro station structure and key assembly technologies. Dans: Tunnelling and Underground Space Technology, v. 153 (novembre 2024). (2024):
- Mechanical properties analysis of joints for prefabricated metro station structure based on Whole-process in-situ monitoring. Dans: Tunnelling and Underground Space Technology, v. 138 (août 2023). (2023):
- Optimization on energy saving ventilation of gallery-type combined construction shaft exhaust in extra long tunnel. Dans: Procedia Engineering, v. 205 ( 2017). (2017):
- (2022): Analysis of the Law of Joint Deformation for Grouted Mortise-Tenon Joint. Dans: Advances in Civil Engineering, v. 2022 (janvier 2022).
- (2021): Experimental Analysis of Bending Stiffness Characteristics of Grouted Double Mortise-Tenon Joint for Prefabricated Metro Station Structure. Dans: Advances in Civil Engineering, v. 2021 (janvier 2021).
- (2021): Experimental Research on Bending Bearing Capability of Grouted Double Mortise-Tenon Joint for Prefabricated Metro Station Structure. Dans: Advances in Civil Engineering, v. 2021 (janvier 2021).
- Prefabrication technology for underground metro station structure. Dans: Tunnelling and Underground Space Technology, v. 108 (février 2021). (2021):
- (2018): Construction Network Ventilation System for Underground LPG Storage Cavern. Dans: Civil Engineering Journal, v. 4, n. 7 (juillet 2018).
- (2019): Influence of Geometrical Parameters on Performance of Grouted Mortise and Tenon Joints for Application in Prefabricated Underground Structures. Dans: Advances in Civil Engineering, v. 2019 ( 2019).
- Effectiveness analysis of water-sealing for underground LPG storage. Dans: Tunnelling and Underground Space Technology, v. 51 (janvier 2016). (2016):
- Transient electromagnetic detection method in water-sealed underground storage caverns. Dans: Underground Space, v. 1, n. 1 (septembre 2016). (2016):