Xinran Li
- Multi-objective optimisation methodology for stiffness combination design of bridge-embankment transition zones in high-speed railways. Dans: Computers and Geotechnics, v. 155 (mars 2023). (2023):
- The Way to Assess the Status of Cables During Service Period for DFS Yangtze River Bridge (Cable-stayed Bridge). Présenté pendant: IABSE Symposium: Structures and Extreme Events, Lisbon, Portugal, 14-17 September 2005. (2005):