0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Gao, J. W. / Li, H. / Zhong, W. L. / Fan, L. F. / Jiang, D. (2023): Effects of artificial geopolymer sand as an alternative to natural sand on dynamic mechanical properties of cement mortar. Dans: Construction and Building Materials, v. 394 (août 2023).

    https://doi.org/10.1016/j.conbuildmat.2023.132181

  2. Teng, J. / Xing, H. B. / Xiao, Y. Q. / Liu, C. Y. / Li, H. / Ou, J. P. (2014): Design and implementation of AMD system for response control in tall buildings. Dans: Smart Structures and Systems, v. 13, n. 2 (février 2014).

    https://doi.org/10.12989/sss.2014.13.2.235

  3. Li, H. / Sansalone, J. (2020): CFD as a Complementary Tool to Benchmark Physical Testing of PM Separation by Unit Operations. Dans: Journal of Environmental Engineering (ASCE), v. 146, n. 11 (novembre 2020).

    https://doi.org/10.1061/(asce)ee.1943-7870.0001803

  4. Li, H. / Sansalone, J. (2020): CFD Model of PM Sedimentation and Resuspension in Urban Water Clarification. Dans: Journal of Environmental Engineering (ASCE), v. 146, n. 3 (mars 2020).

    https://doi.org/10.1061/(asce)ee.1943-7870.0001649

  5. Li, H. / Love, P. E. D. / Drew, D. S. (2000): Effects of overtime work and additional resources on project cost and quality. Dans: Engineering, Construction and Architectural Management, v. 7, n. 3 (mars 2000).

    https://doi.org/10.1108/eb021146

  6. Li, H. / Dai, Y. J. / Li, Y. / La, D. / Wang, R. Z. (2012): Case study of a two-stage rotary desiccant cooling/heating system driven by evacuated glass tube solar air collectors. Dans: Energy and Buildings, v. 47 (avril 2012).

    https://doi.org/10.1016/j.enbuild.2011.11.035

  7. Feng, W. J. / Wang, H. J. / Xue, Y. / Li, H. (2006): Antiplane shear impact of multiple coplanar Griffith cracks in an isotropic functionally graded strip. Dans: Composite Structures, v. 73, n. 3 (juin 2006).

    https://doi.org/10.1016/j.compstruct.2005.02.009

  8. Li, H. / Dai, F. / Weaver, P. M. / Du, S. (2014): Bistable hybrid symmetric laminates. Dans: Composite Structures, v. 116 (septembre 2014).

    https://doi.org/10.1016/j.compstruct.2014.05.030

  9. Teizer, J. / Neve, H. / Li, H. / Wandahl, S. / König, J. / Ochner, B. / König, M. / Lerche, J. (2020): Construction resource efficiency improvement by Long Range Wide Area Network tracking and monitoring. Dans: Automation in Construction, v. 116 (août 2020).

    https://doi.org/10.1016/j.autcon.2020.103245

  10. Li, H. / Huang, Y. / Chen, W. L. / Ma, M. L. / Tao, D. W. / Ou, J. P. (2011): Estimation and Warning of Fatigue Damage of FRP Stay Cables Based on Acoustic Emission Techniques and Fractal Theory. Estimation and warning of fatigue damage of FRP. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 26, n. 7 ( 2011).

    https://doi.org/10.1111/j.1467-8667.2010.00713.x

  11. Li, H. / Harvey, J. / Kendall, A. (2013): Field measurement of albedo for different land cover materials and effects on thermal performance. Dans: Building and Environment, v. 59 (janvier 2013).

    https://doi.org/10.1016/j.buildenv.2012.10.014

  12. Li, H. / Mao, C. X. / Ou, J. P. (2013): Identification of Hysteretic Dynamic Systems by Using Hybrid Extended Kalman Filter and Wavelet Multiresolution Analysis with Limited Observation. Dans: Journal of Engineering Mechanics (ASCE), v. 139, n. 5 (mai 2013).

    https://doi.org/10.1061/(asce)em.1943-7889.0000510

  13. Li, H. / Deeks, A. J. / Liu, L. / Su, X. (2010): Comparison of Chinese and Australian 500 MPa Reinforcing Steel. Dans: Australian Journal of Structural Engineering, v. 10, n. 2 ( 2010).

    https://doi.org/10.1080/13287982.2010.11465039

  14. Cheng, Eddie W. L. / Li, H. / Fang, D. P. / Xie, F. (2004): Construction safety management: an exploratory study from China. Dans: Construction Innovation, v. 4, n. 4 (décembre 2004).

    https://doi.org/10.1108/14714170410815114

  15. Kong, C. W. / Li, H. / Love, P. E. D. (2001): An e‐commerce system for construction material procurement. Dans: Construction Innovation, v. 1, n. 1 (mars 2001).

    https://doi.org/10.1108/14714170110814505

  16. Kayhanian, M. / Li, H. / Harvey, J. T. / Liang, Xiao (2019): Application of permeable pavements in highways for stormwater runoff management and pollution prevention: California research experiences. Dans: International Journal of Transportation Science and Technology, v. 8, n. 4 (décembre 2019).

    https://doi.org/10.1016/j.ijtst.2019.01.001

  17. Li, H. / Shen, L. Y. / Love, P. E. D. (1999): ANN-Based Mark-Up Estimation System with Self-Explanatory Capacities. Dans: Journal of Construction Engineering and Management, v. 125, n. 3 (juin 1999).

    https://doi.org/10.1061/(asce)0733-9364(1999)125:3(185)

  18. Deng, Z. M. / Li, H. / Tam, C. M. / Shen, Q. P. / Love, P. E. D. (2001): An application of the Internet-based project management system. Dans: Automation in Construction, v. 10, n. 2 (janvier 2001).

    https://doi.org/10.1016/s0926-5805(99)00037-0

  19. Antwi-Afari, M. F. / Li, H. / Edwards, D. J. / Pärn, E. A. / Seo, J. / Wong, A. Y. L. (2017): Biomechanical analysis of risk factors for work-related musculoskeletal disorders during repetitive lifting task in construction workers. Dans: Automation in Construction, v. 83 (novembre 2017).

    https://doi.org/10.1016/j.autcon.2017.07.007

  20. Antwi-Afari, M. F. / Li, H. / Pärn, E. A. / Edwards, D. J. (2018): Critical success factors for implementing building information modelling (BIM): A longitudinal review. Dans: Automation in Construction, v. 91 (juillet 2018).

    https://doi.org/10.1016/j.autcon.2018.03.010

  21. Li, H. / Liu, J. K. / Chen, W. H. / Lu, Z. R. / Xia, Y. / Ni, Y. Q. (2015): Analysis of Dynamic Characteristics of the Canton Tower under Different Earthquakes. Dans: Advances in Structural Engineering, v. 18, n. 7 (juillet 2015).

    https://doi.org/10.1260/1369-4332.18.7.1087

  22. Shen, L. Y. / Li, H. / Li, Q. M. (2002): Alternative Concession Model for Build Operate Transfer Contract Projects. Dans: Journal of Construction Engineering and Management, v. 128, n. 4 (août 2002).

    https://doi.org/10.1061/(asce)0733-9364(2002)128:4(326)

  23. Xiao, S. / Li, H. / Lin, G. (2008): Dynamic behaviour and constitutive model of concrete at different strain rates. Dans: Magazine of Concrete Research, v. 60, n. 4 (mai 2008).

    https://doi.org/10.1680/macr.2008.60.4.271

  24. Yan, X. / Li, H. / Wong, Y.-L. (2007): Effect of aggregate on high-strength concrete in fire. Dans: Magazine of Concrete Research, v. 59, n. 5 (juin 2007).

    https://doi.org/10.1680/macr.2007.59.5.323

  25. Love, P. E. D. / Mandal, P. / Li, H. (1999): Determining the causal structure of rework influences in construction. Dans: Construction Management and Economics, v. 17, n. 4 (juillet 1999).

    https://doi.org/10.1080/014461999371420

  26. Peng, X. / Li, H. (2007): Analysis of the magnetomechanical behavior of MRFs based on micromechanics incorporating a statistical approach. Dans: Smart Materials and Structures, v. 16, n. 6 (décembre 2007).

    https://doi.org/10.1088/0964-1726/16/6/051

  27. Peng, X. / Li, H. / Chen, W. (2005): A comprehensive description for shape memory alloys with a two-phase mixture model incorporating the conventional theory of plasticity. Dans: Smart Materials and Structures, v. 14, n. 2 (avril 2005).

    https://doi.org/10.1088/0964-1726/14/2/017

  28. Li, H. / Chen, Z. B. / Tzou, H. S. (2010): Distributed actuation characteristics of clamped-free conical shells using diagonal piezoelectric actuators. Dans: Smart Materials and Structures, v. 19, n. 11 (novembre 2010).

    https://doi.org/10.1088/0964-1726/19/11/115015

  29. Li, H. / Lan, C. M. / Ju, Y. / Li, D. S. (2012): Experimental and Numerical Study of the Fatigue Properties of Corroded Parallel Wire Cables. Dans: Journal of Bridge Engineering (ASCE), v. 17, n. 2 (mars 2012).

    https://doi.org/10.1061/(asce)be.1943-5592.0000235

  30. Zhang, W. P. / Li, H. / Gu, X. L. (2016): Analysis of sample size for on-site inspection of concrete strength by Monte-Carlo method. Présenté pendant: Structural Analysis of Historical Constructions (SAHC) 2016, Leuven, Belgium, 13-15 September 2016.
Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine