Hyun-Soo Lee
- Predicting project cost overrun levels in bidding stage using ensemble learning. Dans: Journal of Asian Architecture and Building Engineering, v. 19, n. 6 (juin 2020). (2020):
- A Real-time Location-based Construction Labor Safety Management System. Dans: Journal of Civil Engineering and Management, v. 20, n. 5 (octobre 2014). (2014):
- RFID-Based Real-Time Locating System for Construction Safety Management. Dans: Journal of Computing in Civil Engineering, v. 26, n. 3 (mai 2012). (2012):
- Workflow dependency approach for modular building construction manufacturing process using Dependency Structure Matrix (DSM). Dans: KSCE Journal of Civil Engineering, v. 21, n. 5 (août 2016). (2016):
- Probabilistic Duration Estimation Model for High-Rise Structural Work. Dans: Journal of Construction Engineering and Management, v. 135, n. 12 (décembre 2009). (2009):
- Strategies for Design-Build in Korea Using System Dynamics Modeling. Dans: Journal of Construction Engineering and Management, v. 135, n. 11 (novembre 2009). (2009):
- Transaction-Cost-Based Selection of Appropriate General Contractor-Subcontractor Relationship Type. Dans: Journal of Construction Engineering and Management, v. 135, n. 11 (novembre 2009). (2009):
- Productivity Forecasting of Newly Added Workers Based on Time-Series Analysis and Site Learning. Dans: Journal of Construction Engineering and Management, v. 141, n. 9 (septembre 2015). (2015):
- Quantity based active schematic estimating (Q-BASE) model. Dans: KSCE Journal of Civil Engineering, v. 17, n. 1 (mai 2012). (2012):
- Simulation-based evaluation of bottleneck in a CBR protective facility. Dans: KSCE Journal of Civil Engineering, v. 22, n. 2 (juin 2017). (2017):
- Productivity management methodology using productivity achievement ratio. Dans: KSCE Journal of Civil Engineering, v. 15, n. 1 (décembre 2010). (2010):
- Supply chain management model for ready mixed concrete. Dans: Automation in Construction, v. 20, n. 1 (janvier 2011). (2011):
- Weather-Delay Simulation Model Based on Vertical Weather Profile for High-Rise Building Construction. Dans: Journal of Construction Engineering and Management, v. 142, n. 6 (juin 2016). (2016):
- Segmenting the Korean housing market using multiple discriminant analysis. Dans: Construction Management and Economics, v. 18, n. 1 (janvier 2000). (2000):
- Schematic cost estimating model for super tall buildings using a high-rise premium ratio. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 38, n. 5 (mai 2011). (2011):