0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Lee, Jin Gang / Lee, Hyun-Soo / Park, Moonseo / Seo, JoonOh (2021): Early-stage cost estimation model for power generation project with limited historical data. Dans: Engineering, Construction and Architectural Management, v. 29, n. 7 (juillet 2021).

    https://doi.org/10.1108/ecam-04-2020-0261

  2. Hyun, Hosang / Yoon, Inseok / Lee, Hyun-Soo / Park, Moonseo / Lee, Jeonghoon (2021): Multiobjective optimization for modular unit production lines focusing on crew allocation and production performance. Dans: Automation in Construction, v. 125 (mai 2021).

    https://doi.org/10.1016/j.autcon.2021.103581

  3. Shin, Hyunji / Lee, Hyun-Soo / Park, Moonseo / Lee, Jin Gang (2018): Facility Management Process of an Office Building. Dans: Journal of Infrastructure Systems, v. 24, n. 3 (septembre 2018).

    https://doi.org/10.1061/(asce)is.1943-555x.0000436

  4. Choi, Minji / Lee, SangHyun / Park, Moonseo / Lee, Hyun-Soo (2018): Effect of Dynamic Emergency Cues on Fire Evacuation Performance in Public Buildings. Dans: Journal of Infrastructure Systems, v. 24, n. 4 (décembre 2018).

    https://doi.org/10.1061/(asce)is.1943-555x.0000449

  5. Song, Kwonsik / Kwon, Nahyun / Anderson, Kyle / Park, Moonseo / Lee, Hyun-Soo / Lee, SangHyun (2017): Predicting hourly energy consumption in buildings using occupancy-related characteristics of end-user groups. Dans: Energy and Buildings, v. 156 (décembre 2017).

    https://doi.org/10.1016/j.enbuild.2017.09.060

  6. Lee, Bogyeong / Ahn, Changbum Ryan / Mohan, Prakhar / Chaspari, Theodora / Lee, Hyun-Soo (2020): Evaluating Routine Variability of Daily Activities in Smart Homes with Image Complexity Measures. Dans: Journal of Computing in Civil Engineering, v. 34, n. 6 (novembre 2020).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000924

  7. Lee, Seulbi / Park, Moonseo / Lee, Hyun-Soo / Ham, Youngjib (2020): Impact of Demand-Side Response on Community Resilience: Focusing on a Power Grid after Seismic Hazards. Dans: Journal of Management in Engineering (ASCE), v. 36, n. 6 (novembre 2020).

    https://doi.org/10.1061/(asce)me.1943-5479.0000844

  8. Cho, Jongwoo / Lee, Hyun-Soo / Park, Moonseo / Song, Kwonsik / Kim, Jaegon / Kwon, Nahyun (2020): Estimating the Performance of Heavy Impact Sound Insulation Using Empirical Approaches. Dans: Journal of Asian Architecture and Building Engineering, v. 20, n. 3 (octobre 2020).

    https://doi.org/10.1080/13467581.2020.1786390

  9. Hyun, Hosang / Jung, Minhyuk / Yoon, Inseok / Lee, Hyun-Soo / Lee, Jeonghoon (2020): Multiple work zone strategy for repetitive on-site work of modular construction using parallel station method. Dans: Journal of Asian Architecture and Building Engineering, v. 20, n. 3 (octobre 2020).

    https://doi.org/10.1080/13467581.2020.1782917

  10. Ahn, Joseph / Ji, Sae-Hyun / Ahn, Sung Jin / Park, Moonseo / Lee, Hyun-Soo / Kwon, Nahyun / Lee, Eul-Bum / Kim, Yonggu (2020): Performance evaluation of normalization-based CBR models for improving construction cost estimation. Dans: Automation in Construction, v. 119 (novembre 2020).

    https://doi.org/10.1016/j.autcon.2020.103329

  11. Jang, Youjin / Kwon, Nahyun / Ahn, Yonghan / Lee, Hyun-Soo / Park, Moonseo (2019): International Diversification and Performance of Construction Companies: Moderating Effect of Regional, Product, and Industry Diversifications. Dans: Journal of Management in Engineering (ASCE), v. 35, n. 5 (septembre 2019).

    https://doi.org/10.1061/(asce)me.1943-5479.0000713

  12. Lee, Kwang-Pyo / Lee, Hyun-Soo / Park, Moonseo / Kim, Du Yon / Jung, Minhyuk (2017): Management-Reserve Estimation for International Construction Projects Based on Risk-Informed k-NN. Dans: Journal of Management in Engineering (ASCE), v. 33, n. 4 (juillet 2017).

    https://doi.org/10.1061/(asce)me.1943-5479.0000510

  13. Park, Moonseo / Chu, Yongsik / Lee, Hyun-Soo / Kim, Wooyoung (2009): Evaluation Methods for Construction Projects. Dans: Journal of Civil Engineering and Management, v. 15, n. 4 (décembre 2009).

    https://doi.org/10.3846/1392-3730.2009.15.349-359

  14. Jung, Minhyuk / Park, Moonseo / Lee, Hyun-Soo / Chi, Seokho (2018): Multimethod Supply Chain Simulation Model for High-Rise Building Construction Projects. Dans: Journal of Computing in Civil Engineering, v. 32, n. 3 (mai 2018).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000751

  15. Ji, Sae-Hyun / Park, Moonseo / Lee, Hyun-Soo / Ahn, Joseph / Kim, Namho / Son, Bosik (2011): Military Facility Cost Estimation System Using Case-Based Reasoning in Korea. Dans: Journal of Computing in Civil Engineering, v. 25, n. 3 (mai 2011).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000082

  16. Kim, Hyunsoo / Lee, Hyun-Soo / Park, Moonseo / Chung, BooYoung / Hwang, Sungjoo (2015): Information Retrieval Framework for Hazard Identification in Construction. Dans: Journal of Computing in Civil Engineering, v. 29, n. 3 (mai 2015).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000340

  17. Park, Moonseo / Lee, Kyung-won / Lee, Hyun-Soo / Jiayi, Pan / Yu, Jungho (2013): Ontology-based construction knowledge retrieval system. Dans: KSCE Journal of Civil Engineering, v. 17, n. 7 (octobre 2013).

    https://doi.org/10.1007/s12205-013-1155-6

  18. Yi, Kyoo Jin / Lee, Hyun-Soo / Choi, Yoon Ki (2002): Network Creation and Development for Repetitive-Unit Projects. Dans: Journal of Construction Engineering and Management, v. 128, n. 3 (juin 2002).

    https://doi.org/10.1061/(asce)0733-9364(2002)128:3(257)

  19. Yu, Jung-Ho / Lee, Hyun-Soo / Kim, Wooyoung (2006): Evaluation Model for Information Systems Benefits in Construction Management Processes. Dans: Journal of Construction Engineering and Management, v. 132, n. 10 (octobre 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:10(1114)

  20. Lee, Hyun-Soo / Lee, Jae-Yong / Lee, Jae-Seob (1999): Nonshored Formwork System for Top-Down Construction. Dans: Journal of Construction Engineering and Management, v. 125, n. 6 (décembre 1999).

    https://doi.org/10.1061/(asce)0733-9364(1999)125:6(392)

  21. Lee, Bogyeong / Lee, Hyun-Soo / Park, Moonseo / Kim, Hyunsoo (2015): Influence Factors of Learning-Curve Effect in High-Rise Building Constructions. Dans: Journal of Construction Engineering and Management, v. 141, n. 8 (août 2015).

    https://doi.org/10.1061/(asce)co.1943-7862.0000997

  22. Park, Moonseo / Yang, Youngjun / Lee, Hyun-Soo / Han, Sangwon / Ji, Sae-Hyun (2012): Floor-Level Construction Material Layout Planning Model Considering Actual Travel Path. Dans: Journal of Construction Engineering and Management, v. 138, n. 7 (juillet 2012).

    https://doi.org/10.1061/(asce)co.1943-7862.0000493

  23. Hwang, Sungjoo / Park, Moonseo / Lee, Hyun-Soo / Lee, SangHyun / Kim, Hyunsoo (2015): Postdisaster Interdependent Built Environment Recovery Efforts and the Effects of Governmental Plans: Case Analysis Using System Dynamics. Dans: Journal of Construction Engineering and Management, v. 141, n. 3 (mars 2015).

    https://doi.org/10.1061/(asce)co.1943-7862.0000939

  24. Lee, Hyun-Soo / Roh, San / Park, Moon-Seo / Ryu, Han-Guk (2010): Optimal option selection for finishing works of high-rise building. Dans: KSCE Journal of Civil Engineering, v. 14, n. 5 (juillet 2010).

    https://doi.org/10.1007/s12205-010-0904-z

  25. Park, Moonseo / Ha, Sungbong / Lee, Hyun-Soo / Choi, Yoon-ki / Kim, Hyunsoo / Han, Sangwon (2013): Lifting demand-based zoning for minimizing worker vertical transportation time in high-rise building construction. Dans: Automation in Construction, v. 32 (juillet 2013).

    https://doi.org/10.1016/j.autcon.2013.01.010

  26. Choi, Byungjoo / Lee, Hyun-Soo / Park, Moonseo / Cho, Yong K. / Kim, Hyunsoo (2014): Framework for Work-Space Planning Using Four-Dimensional BIM in Construction Projects. Dans: Journal of Construction Engineering and Management, v. 140, n. 9 (septembre 2014).

    https://doi.org/10.1061/(asce)co.1943-7862.0000885

  27. Lee, Hyun-Soo / Ryu, Han-Guk / Yu, Jung-Ho / Kim, Jae-Jun (2005): Method for Calculating Schedule Delay Considering Lost Productivity. Dans: Journal of Construction Engineering and Management, v. 131, n. 11 (novembre 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:11(1147)

  28. Lee, Hyun-Soo / Yu, Jung-Ho / Kim, Sun-Kuk (2004): Impact of Labor Factors on Workflow. Dans: Journal of Construction Engineering and Management, v. 130, n. 6 (décembre 2004).

    https://doi.org/10.1061/(asce)0733-9364(2004)130:6(918)

  29. Hwang, Sungjoo / Park, Moonseo / Lee, Hyun-Soo / Lee, SangHyun (2016): Hybrid Simulation Framework for Immediate Facility Restoration Planning after a Catastrophic Disaster. Dans: Journal of Construction Engineering and Management, v. 142, n. 8 (août 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001146

  30. Hwang, Sungjoo / Park, Moonseo / Lee, Hyun-Soo / Lee, SangHyun / Kim, Hyunsoo (2013): Dynamic Feasibility Analysis of the Housing Supply Strategies in a Recession: Korean Housing Market. Dans: Journal of Construction Engineering and Management, v. 139, n. 2 (février 2013).

    https://doi.org/10.1061/(asce)co.1943-7862.0000577

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine