E. W. M. Lee
- An analysis of a medium size grid-connected building integrated photovoltaic (BIPV) system using measured data. Dans: Energy and Buildings, v. 60 (mai 2013). (2013):
- Student learning performance and indoor environmental quality (IEQ) in air-conditioned university teaching rooms. Dans: Building and Environment, v. 49 (mars 2012). (2012):
- Off-site construction optimization: Sequencing multiple job classes with time constraints. Dans: Automation in Construction, v. 71 (novembre 2016). (2016):
- Analysis of Disruptions Caused by Construction Field Rework on Productivity in Residential Projects. Dans: Journal of Construction Engineering and Management, v. 140, n. 2 (février 2014). (2014):
- Framework for improving workflow stability: deployment of optimized capacity buffers in a synchronized construction production. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 41, n. 12 (décembre 2014). (2014):