E. W. M. Lee
- An analysis of a medium size grid-connected building integrated photovoltaic (BIPV) system using measured data. In: Energy and Buildings, v. 60 (Mai 2013). (2013):
- Student learning performance and indoor environmental quality (IEQ) in air-conditioned university teaching rooms. In: Building and Environment, v. 49 (März 2012). (2012):
- Off-site construction optimization: Sequencing multiple job classes with time constraints. In: Automation in Construction, v. 71 (November 2016). (2016):
- Analysis of Disruptions Caused by Construction Field Rework on Productivity in Residential Projects. In: Journal of Construction Engineering and Management, v. 140, n. 2 (Februar 2014). (2014):
- Framework for improving workflow stability: deployment of optimized capacity buffers in a synchronized construction production. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 41, n. 12 (Dezember 2014). (2014):