0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Patrick T. I. Lam ORCID

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Javed, Arshad Ali / Lam, Patrick T. I. / Chan, Albert P. C. (2013): Change negotiation in public-private partnership projects through output specifications: an experimental approach based on game theory. Dans: Construction Management and Economics, v. 32, n. 4 (avril 2013).

    https://doi.org/10.1080/01446193.2014.895846

  2. Chan, Albert P. C. / Lam, Patrick T. I. / Wen, Yang / Ameyaw, Ernest E. / Wang, ShouQing / Ke, Yongjian (2015): Cross-Sectional Analysis of Critical Risk Factors for PPP Water Projects in China. Dans: Journal of Infrastructure Systems, v. 21, n. 1 (mars 2015).

    https://doi.org/10.1061/(asce)is.1943-555x.0000214

  3. Chan, Daniel W. M. / Lam, Patrick T. I. / Chan, Albert P. C. / Wong, James M. W. (2011): Guaranteed maximum price (GMP) contracts in practice. A case study of a private office development project in Hong Kong. Dans: Engineering, Construction and Architectural Management, v. 18, n. 2 (mars 2011).

    https://doi.org/10.1108/09699981111111157

  4. Lau, Chung Him / Mesthrige, Jayantha Wadu / Lam, Patrick T. I. / Javed, Arshad Ali (2019): The challenges of adopting new engineering contract: a Hong Kong study. Dans: Engineering, Construction and Architectural Management, v. 26, n. 10 (octobre 2019).

    https://doi.org/10.1108/ecam-02-2018-0055

  5. Ansah, Mark Kyeredey / Chen, Xi / Yang, Hongxing / Lu, Lin / Lam, Patrick T. I. (2020): An integrated life cycle assessment of different façade systems for a typical residential building in Ghana. Dans: Sustainable Cities and Society, v. 53 (février 2020).

    https://doi.org/10.1016/j.scs.2019.101974

  6. Yang, Wenjing / Lam, Patrick T. I. (2021): Evaluating non-market costs of ICT involving data transmission in smart cities. Dans: Building Research & Information, v. 49, n. 7 (juin 2021).

    https://doi.org/10.1080/09613218.2020.1870426

  7. Xu, PengPeng / Chan, Edwin H. W. / Lam, Patrick T. I. (2013): A Conceptual Framework for Delivering Sustainable Building Energy Efficency Retrofit Using the Energy Performance Contracting (EPC) in China. Dans: Journal of Green Building, v. 8, n. 1 (avril 2013).

    https://doi.org/10.3992/jgb.8.1.177

  8. Wei, Yigang / Lam, Patrick T. I. (2014): Innovation Barriers at the Project Level: Study of a UK Construction Firm. Dans: International Journal of Architecture Engineering and Construction, v. 3, n. 3 ( 2014).

    https://doi.org/10.7492/ijaec.2014.015

  9. Lam, Patrick T. I. / Yu, Jack S. / Yang, H. X. (2015): Business Models for the Integrated Use of Photovoltaics in Buildings. Dans: International Journal of Architecture Engineering and Construction, v. 4, n. 3 (septembre 2015).

    https://doi.org/10.7492/ijaec.2015.015

  10. Lee, Pan / Lam, Patrick T. I. (2015): A Conceptual Model of Energy Performance Contracting: An Alternative Solution to Retrofit Existing Buildings. Dans: International Journal of Architecture Engineering and Construction, v. 4, n. 2 (juin 2015).

    https://doi.org/10.7492/ijaec.2015.011

  11. Lam, Patrick T. I. / Fu, Franco C. S. (2019): Exploratory Study on Current Status of Startups in the Hong Kong Built Environment Sector. Dans: Journal of Management in Engineering (ASCE), v. 35, n. 4 (juillet 2019).

    https://doi.org/10.1061/(asce)me.1943-5479.0000696

  12. Lam, Patrick T. I. / Chiang, Y. H. / Chan, Stephen H. (2011): Critical Success Factors for Bond Financing of Construction Projects in Asia. Dans: Journal of Management in Engineering (ASCE), v. 27, n. 4 (octobre 2011).

    https://doi.org/10.1061/(asce)me.1943-5479.0000063

  13. Wong, Franky W. H. / Lam, Patrick T. I. (2011): Difficulties and Hindrances Facing End Users of Electronic Information Exchange Systems in Design and Construction. Dans: Journal of Management in Engineering (ASCE), v. 27, n. 1 (janvier 2011).

    https://doi.org/10.1061/(asce)me.1943-5479.0000028

  14. Chan, Albert P. C. / Chan, Daniel W. M. / Fan, Linda C. N. / Lam, Patrick T. I. / Yeung, John F. Y. (2008): Achieving Partnering Success through an Incentive Agreement: Lessons Learned from an Underground Railway Extension Project in Hong Kong. Dans: Journal of Management in Engineering (ASCE), v. 24, n. 3 (juillet 2008).

    https://doi.org/10.1061/(asce)0742-597x(2008)24:3(128)

  15. Lam, Patrick T. I. / Wong, Franky W. H. (2008): Implementing a Buildability Assessment Model for Buildability Improvement. Dans: Architectural Science Review, v. 51, n. 2 (juin 2008).

    https://doi.org/10.3763/asre.2008.5121

  16. Wong, Franky W. H. / Darshi de Saram, D. / Lam, Patrick T. I. / Chan, Daniel W. M. (2006): A Compendium of Buildability Issues from the Viewpoints of Construction Practitioners. Dans: Architectural Science Review, v. 49, n. 1 (mars 2006).

    https://doi.org/10.3763/asre.2006.4910

  17. Lam, Patrick T. I. / Chan, Edwin H. W. / Chau, C. K. / Poon, C. S. / Chun, K. P. (2009): Integrating Green Specifications in Construction and Overcoming Barriers in Their Use. Dans: Journal of Professional Issues in Engineering Education and Practice, v. 135, n. 4 (octobre 2009).

    https://doi.org/10.1061/(asce)1052-3928(2009)135:4(142)

  18. Lam, Patrick T. I. / Wong, Franky W. H. (2011): A comparative study of buildability perspectives between clients, consultants and contractors. Dans: Construction Innovation, v. 11, n. 3 (juillet 2011).

    https://doi.org/10.1108/14714171111149025

  19. Chiang, Yat‐Hung / Cheng, Eddie W. L. / Lam, Patrick T. I. (2010): Epistemology of capital structure decisions by building contractors in Hong Kong. Dans: Construction Innovation, v. 10, n. 3 (juillet 2010).

    https://doi.org/10.1108/14714171011060105

  20. Lam, Patrick T. I. / Wong, Franky W. H. / Tse, Kenny T. C. (2010): Effectiveness of ICT for Construction Information Exchange among Multidisciplinary Project Teams. Dans: Journal of Computing in Civil Engineering, v. 24, n. 4 (juillet 2010).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000038

  21. Chan, Albert P. C. / Lam, Patrick T. I. / Chan, Daniel W. M. / Cheung, Esther / Ke, Yongjian (2010): Critical Success Factors for PPPs in Infrastructure Developments: Chinese Perspective. Dans: Journal of Construction Engineering and Management, v. 136, n. 5 (mai 2010).

    https://doi.org/10.1061/(asce)co.1943-7862.0000152

  22. Chan, Daniel W. M. / Chan, Albert P. C. / Lam, Patrick T. I. / Wong, James M. W. (2010): Empirical Study of the Risks and Difficulties in Implementing Guaranteed Maximum Price and Target Cost Contracts in Construction. Dans: Journal of Construction Engineering and Management, v. 136, n. 5 (mai 2010).

    https://doi.org/10.1061/(asce)co.1943-7862.0000153

  23. Chan, Albert P. C. / Lam, Patrick T. I. / Chan, Daniel W. M. / Cheung, Esther / Ke, Yongjian (2009): Drivers for Adopting Public Private Partnerships—Empirical Comparison between China and Hong Kong Special Administrative Region. Dans: Journal of Construction Engineering and Management, v. 135, n. 11 (novembre 2009).

    https://doi.org/10.1061/(asce)co.1943-7862.0000088

  24. Lam, Patrick T. I. / Wong, Franky W. H. (2009): Improving building project performance: how buildability benchmarking can help. Dans: Construction Management and Economics, v. 27, n. 1 (janvier 2009).

    https://doi.org/10.1080/01446190802570498

  25. Thomas Ng, S. / Fan, Ryan Y. C. / Wong, James M. W. / Chan, Albert P. C. / Chiang, Y. H. / Lam, Patrick T. I. / Kumaraswamy, Mohan (2009): Coping with structural change in construction: experiences gained from advanced economies. Dans: Construction Management and Economics, v. 27, n. 2 (février 2009).

    https://doi.org/10.1080/01446190802699040

  26. Chan, Albert P. C. / Yung, Esther H. K. / Lam, Patrick T. I. / Tam, C. M. / Cheung, S. O. (2001): Application of Delphi method in selection of procurement systems for construction projects. Dans: Construction Management and Economics, v. 19, n. 7 (novembre 2001).

    https://doi.org/10.1080/01446190110066128

  27. Wong, Franky W. H. / Lam, Patrick T. I. / Chan, Edwin H. W. / Wong, Francis K. W. (2006): Factors affecting buildability of building designs. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 33, n. 7 (juillet 2006).

    https://doi.org/10.1139/l06-022

  28. Lam, Patrick T. I. / Chan, Albert P. C. / Wong, Francis K. W. / Wong, Franky W. H. (2007): Constructability Rankings of Construction Systems Based on the Analytical Hierarchy Process. Dans: Journal of Architectural Engineering (ASCE), v. 13, n. 1 (mars 2007).

    https://doi.org/10.1061/(asce)1076-0431(2007)13:1(36)

  29. Lam, Patrick T. I. / Javed, Arshad Ali (2015): Comparative Study on the Use of Output Specifications for Australian and U.K. PPP/PFI Projects. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 29, n. 2 (avril 2015).

    https://doi.org/10.1061/(asce)cf.1943-5509.0000554

  30. Chiang, Y. H. / Cheng, Eddie W. L. / Lam, Patrick T. I. (2010): Employing the Net Present Value-Consistent IRR Methods for PFI Contracts. Dans: Journal of Construction Engineering and Management, v. 136, n. 7 (juillet 2010).

    https://doi.org/10.1061/(asce)co.1943-7862.0000179

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine