John A. Kuprenas
- Seismic Retrofit Program for Los Angeles Bridges. Dans: Journal of Infrastructure Systems, v. 4, n. 4 (décembre 1998). (1998):
- Cost Performance Comparison of Two Public Sector Project Procurement Techniques. Dans: Journal of Management in Engineering (ASCE), v. 23, n. 3 (juillet 2007). (2007):
- Project Management Actions to Improve Design Phase Cost Performance. Dans: Journal of Management in Engineering (ASCE), v. 19, n. 1 (janvier 2003). (2003):
- Strategic Planning in Public Sector Engineering Organization. Dans: Journal of Management in Engineering (ASCE), v. 16, n. 5 (septembre 2000). (2000):
- Performance Measurement of Training in Engineering Organizations. Dans: Journal of Management in Engineering (ASCE), v. 16, n. 5 (septembre 2000). (2000):
- A Project Management Training Program. Dans: Journal of Management in Engineering (ASCE), v. 15, n. 6 (novembre 1999). (1999):
- Implementation of Project Management in Public Engineering Organization. Dans: Journal of Management in Engineering (ASCE), v. 15, n. 3 (mai 1999). (1999):
- Arbitration: A Look at its Form and Performance. Dans: Journal of Construction Engineering and Management, v. 113, n. 3 (septembre 1987). (1987):
- Bridge Falsework Productivity—Measurement and Influences. Dans: Journal of Construction Engineering and Management, v. 129, n. 3 (juin 2003). (2003):
- Segmental Cantilever Bridge Construction Case Study. Dans: Journal of Construction Engineering and Management, v. 123, n. 1 (mars 1997). (1997):
- Total Quality Management Implementations and Results: Progress Update. Dans: Practice Periodical on Structural Design and Construction, v. 3, n. 1 (février 1998). (1998):
- Total Quality Management Implementation and Results. Dans: Practice Periodical on Structural Design and Construction, v. 1, n. 2 (mai 1996). (1996):