John A. Kuprenas
- Seismic Retrofit Program for Los Angeles Bridges. In: Journal of Infrastructure Systems, v. 4, n. 4 (Dezember 1998). (1998):
- Cost Performance Comparison of Two Public Sector Project Procurement Techniques. In: Journal of Management in Engineering (ASCE), v. 23, n. 3 (Juli 2007). (2007):
- Project Management Actions to Improve Design Phase Cost Performance. In: Journal of Management in Engineering (ASCE), v. 19, n. 1 (Januar 2003). (2003):
- Strategic Planning in Public Sector Engineering Organization. In: Journal of Management in Engineering (ASCE), v. 16, n. 5 (September 2000). (2000):
- Performance Measurement of Training in Engineering Organizations. In: Journal of Management in Engineering (ASCE), v. 16, n. 5 (September 2000). (2000):
- A Project Management Training Program. In: Journal of Management in Engineering (ASCE), v. 15, n. 6 (November 1999). (1999):
- Implementation of Project Management in Public Engineering Organization. In: Journal of Management in Engineering (ASCE), v. 15, n. 3 (Mai 1999). (1999):
- Arbitration: A Look at its Form and Performance. In: Journal of Construction Engineering and Management, v. 113, n. 3 (September 1987). (1987):
- Bridge Falsework Productivity—Measurement and Influences. In: Journal of Construction Engineering and Management, v. 129, n. 3 (Juni 2003). (2003):
- Segmental Cantilever Bridge Construction Case Study. In: Journal of Construction Engineering and Management, v. 123, n. 1 (März 1997). (1997):
- Total Quality Management Implementations and Results: Progress Update. In: Practice Periodical on Structural Design and Construction, v. 3, n. 1 (Februar 1998). (1998):
- Total Quality Management Implementation and Results. In: Practice Periodical on Structural Design and Construction, v. 1, n. 2 (Mai 1996). (1996):