0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Mohan M. Kumaraswamy

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Ekanayake, E. M. A. C. / Shen, Geoffrey Q. P. / Kumaraswamy, Mohan M. / Owusu, Emmanuel K. / Saka, Abdullahi B. (2021): Modeling Supply Chain Resilience in Industrialized Construction: A Hong Kong Case. Dans: Journal of Construction Engineering and Management, v. 147, n. 11 (novembre 2021).

    https://doi.org/10.1061/(asce)co.1943-7862.0002188

  2. Yang, Ying Nan / Kumaraswamy, Mohan M. / Pam, Hoat Joen / Xie, Hong Ming (2013): Integrating Semiparametric and Parametric Models in Survival Analysis of Bridge Element Deterioration. Dans: Journal of Infrastructure Systems, v. 19, n. 2 (juin 2013).

    https://doi.org/10.1061/(asce)is.1943-555x.0000115

  3. Kumaraswamy, Mohan M. (1996): The pursuit of quality in Hong Kong construction. Dans: Engineering, Construction and Architectural Management, v. 3, n. 4 (avril 1996).

    https://doi.org/10.1108/eb021036

  4. Kumaraswamy, Mohan M. (1998): Industry development through creative project packaging and integrated management. Dans: Engineering, Construction and Architectural Management, v. 5, n. 3 (mars 1998).

    https://doi.org/10.1108/eb021077

  5. Dissanayaka, Sunil M. / Kumaraswamy, Mohan M. (1999): Evaluation of factors affecting time and cost performance in Hong Kong building projects. Dans: Engineering, Construction and Architectural Management, v. 6, n. 3 (mars 1999).

    https://doi.org/10.1108/eb021119

  6. Wan, Sammy K. M. / Kumaraswamy, Mohan M. (2009): Industrial management approaches for improving material control in building services works. Dans: Engineering, Construction and Architectural Management, v. 16, n. 3 (mai 2009).

    https://doi.org/10.1108/09699980910951636

  7. Wan, Sammy K. M. / Kumaraswamy, Mohan M. (2012): Improving building services coordination at the pre‐installation stage. Dans: Engineering, Construction and Architectural Management, v. 19, n. 3 (avril 2012).

    https://doi.org/10.1108/09699981211219580

  8. Ekanayake, E. M. A. C. / Shen, Geoffrey / Kumaraswamy, Mohan M. (2019): Mapping the knowledge domains of value management: a bibliometric approach. Dans: Engineering, Construction and Architectural Management, v. 26, n. 3 (avril 2019).

    https://doi.org/10.1108/ecam-06-2018-0252

  9. Chan, Daniel W. M. / Kumaraswamy, Mohan M. (1999): Forecasting construction durations for public housing projects: a Hong Kong perspective. Dans: Building and Environment, v. 34, n. 5 (septembre 1999).

    https://doi.org/10.1016/s0360-1323(98)00040-7

  10. Chan, Daniel W. M. / Kumaraswamy, Mohan M. (1996): An evaluation of construction time performance in the building industry. Dans: Building and Environment, v. 31, n. 6 (novembre 1996).

    https://doi.org/10.1016/0360-1323(96)00031-5

  11. Yang, Ying Nan / Kumaraswamy, Mohan M. / Pam, Hoat Joen / Mahesh, Gangadhar (2011): Integrated Qualitative and Quantitative Methodology to Assess Validity and Credibility of Models for Bridge Maintenance Management System Development. Dans: Journal of Management in Engineering (ASCE), v. 27, n. 3 (juillet 2011).

    https://doi.org/10.1061/(asce)me.1943-5479.0000051

  12. Rahman, M. Motiar / Kumaraswamy, Mohan M. (2004): Potential for Implementing Relational Contracting and Joint Risk Management. Dans: Journal of Management in Engineering (ASCE), v. 20, n. 4 (octobre 2004).

    https://doi.org/10.1061/(asce)0742-597x(2004)20:4(178)

  13. Kumaraswamy, Mohan M. / Matthews, Jason D. (2000): Improved Subcontractor Selection Employing Partnering Principles. Dans: Journal of Management in Engineering (ASCE), v. 16, n. 3 (mai 2000).

    https://doi.org/10.1061/(asce)0742-597x(2000)16:3(47)

  14. Palaneeswaran, Ekambaram / Love, Peter E. D. / Kumaraswamy, Mohan M. / Ng, Thomas S. T. (2008): Mapping rework causes and effects using artificial neural networks. Dans: Building Research & Information, v. 36, n. 5 ( 2008).

    https://doi.org/10.1080/09613210802128269

  15. Kumaraswamy, Mohan M. / Dissanayaka, Sunil M. (1998): Linking procurement systems to project priorities. Dans: Building Research & Information, v. 26, n. 4 ( 1998).

    https://doi.org/10.1080/096132198369832

  16. Lam, Patrick T. I. / Kumaraswamy, Mohan M. / Ng, T. S. T. (2007): International Treatise on Construction Specification Problems from a Legal Perspective. Dans: Journal of Professional Issues in Engineering Education and Practice, v. 133, n. 3 (juillet 2007).

    https://doi.org/10.1061/(asce)1052-3928(2007)133:3(229)

  17. Kumaraswamy, Mohan M. (1997): Improving Industry Performance through Integrated Training Programs. Dans: Journal of Professional Issues in Engineering Education and Practice, v. 123, n. 3 (juillet 1997).

    https://doi.org/10.1061/(asce)1052-3928(1997)123:3(93)

  18. Zhang, X. Q. / Kumaraswamy, Mohan M. (2001): Procurement Protocols for Public-Private Partnered Projects. Dans: Journal of Construction Engineering and Management, v. 127, n. 5 (octobre 2001).

    https://doi.org/10.1061/(asce)0733-9364(2001)127:5(351)

  19. Zhang, Xue-qing / Kumaraswamy, Mohan M. (2001): Hong Kong Experience in Managing BOT Projects. Dans: Journal of Construction Engineering and Management, v. 127, n. 2 (avril 2001).

    https://doi.org/10.1061/(asce)0733-9364(2001)127:2(154)

  20. Kumaraswamy, Mohan M. / Rahman, M. Motiar / Ling, Florence Yean / Phng, Siew Ting (2005): Reconstructing Cultures for Relational Contracting. Dans: Journal of Construction Engineering and Management, v. 131, n. 10 (octobre 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:10(1065)

  21. Anvuur, Aaron M. / Kumaraswamy, Mohan M. (2012): Measurement and Antecedents of Cooperation in Construction. Dans: Journal of Construction Engineering and Management, v. 138, n. 7 (juillet 2012).

    https://doi.org/10.1061/(asce)co.1943-7862.0000498

  22. Rahman, M. Motiar / Kumaraswamy, Mohan M. (2012): Multicountry Perspectives of Relational Contracting and Integrated Project Teams. Dans: Journal of Construction Engineering and Management, v. 138, n. 4 (avril 2012).

    https://doi.org/10.1061/(asce)co.1943-7862.0000463

  23. Palaneeswaran, Ekambaram / Kumaraswamy, Mohan M. (2008): An integrated decision support system for dealing with time extension entitlements. Dans: Automation in Construction, v. 17, n. 4 (mai 2008).

    https://doi.org/10.1016/j.autcon.2007.08.002

  24. Chung, Jacky K. H. / Kumaraswamy, Mohan M. / Palaneeswaran, Ekambaram (2009): Improving megaproject briefing through enhanced collaboration with ICT. Dans: Automation in Construction, v. 18, n. 7 (novembre 2009).

    https://doi.org/10.1016/j.autcon.2009.05.001

  25. Ling, Florence Y. Y. / Ning, Yan / Ke, Yongjian / Kumaraswamy, Mohan M. (2013): Modeling relational transaction and relationship quality among team members in public projects in Hong Kong. Dans: Automation in Construction, v. 36 (décembre 2013).

    https://doi.org/10.1016/j.autcon.2013.08.006

  26. Ling, Florence Y. Y. / Ke, Yongjian / Kumaraswamy, Mohan M. / Wang, ShouQing (2014): Key Relational Contracting Practices Affecting Performance of Public Construction Projects in China. Dans: Journal of Construction Engineering and Management, v. 140, n. 1 (janvier 2014).

    https://doi.org/10.1061/(asce)co.1943-7862.0000781

  27. Kumaraswamy, Mohan M. / Dissanayaka, Sunil M. (2000): ISO 9000 and beyond: from a Hong Kong construction perspective. Dans: Construction Management and Economics, v. 18, n. 7 (octobre 2000).

    https://doi.org/10.1080/014461900433078

  28. Rahman, M. Motiar / Kumaraswamy, Mohan M. (2002): Joint risk management through transactionally efficient relational contracting. Dans: Construction Management and Economics, v. 20, n. 1 (janvier 2002).

    https://doi.org/10.1080/01446190110089682

  29. Chan, Daniel W. M. / Kumaraswamy, Mohan M. (1999): Modelling and predicting construction durations in Hong Kong public housing. Dans: Construction Management and Economics, v. 17, n. 3 (mai 1999).

    https://doi.org/10.1080/014461999371556

  30. Palaneeswaran, Ekambaram / Kumaraswamy, Mohan M. (2003): Knowledge Mining of Information Sources for Research in Construction Management. Dans: Journal of Construction Engineering and Management, v. 129, n. 2 (mars - avril 2003).

    https://doi.org/10.1061/(asce)0733-9364(2003)129:2(182)

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine