0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Mohan M. Kumaraswamy

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Dewagoda, Kaveesha Gihani / Thomas Ng, S. / Kumaraswamy, Mohan M. (2022): Design for Circularity: The Case of the Building Construction Industry. Dans: IOP Conference Series: Earth and Environmental Science, v. 1101, n. 6 (1 novembre 2022).

    https://doi.org/10.1088/1755-1315/1101/6/062026

  2. Kumaraswamy, Mohan M. / Hewa Welege, Nandun Madhusanka / Pan, Wei (2023): Accelerating the Delivery of Low-Carbon Buildings by Addressing Common Constraints: Perspectives from High-Rise, High-Density Cities. Dans: Buildings, v. 13, n. 6 (23 mai 2023).

    https://doi.org/10.3390/buildings13061455

  3. Madhusanka, H. W. N. / Pan, Wei / Kumaraswamy, Mohan M. (2022): Constraints to low-carbon building: Perspectives from high-rise high-density cities. Dans: Energy and Buildings, v. 275 (novembre 2022).

    https://doi.org/10.1016/j.enbuild.2022.112497

  4. Hewa Welege, Nandun Madhusanka / Pan, Wei / Kumaraswamy, Mohan M. (2023): Engaging Stakeholders to Overcome the Common Constraints for Delivering Low Carbon Buildings in High-Rise High-Density Cities. Dans: Journal of Construction Engineering and Management, v. 149, n. 1 (janvier 2023).

    https://doi.org/10.1061/jcemd4.coeng-12327

  5. Zhang, Xue-qing / Kumaraswamy, Mohan M. (2001): BOT-Based Approaches to Infrastructure Development in China. Dans: Journal of Infrastructure Systems, v. 7, n. 1 (mars 2001).

    https://doi.org/10.1061/(asce)1076-0342(2001)7:1(18)

  6. Kumaraswamy, Mohan M. (1997): Conflicts, claims and disputes in construction. Dans: Engineering, Construction and Architectural Management, v. 4, n. 2 (février 1997).

    https://doi.org/10.1108/eb021042

  7. Anvuur, Aaron M. / Kumaraswamy, Mohan M. / Mahesh, Gangadhar (2011): Building "relationally integrated value networks" (RIVANS). Dans: Engineering, Construction and Architectural Management, v. 18, n. 1 (janvier 2011).

    https://doi.org/10.1108/09699981111098711

  8. Ekambaram, Palaneeswaran / Love, Peter E. D. / Kumaraswamy, Mohan M. / Ng, Thomas S. T. (2014): Causal ascription of rework in building and civil engineering projects. A multivariate exploration. Dans: Engineering, Construction and Architectural Management, v. 21, n. 1 (janvier 2014).

    https://doi.org/10.1108/ecam-04-2010-0029

  9. Sutrisna, Monty / Kumaraswamy, Mohan M. (2015): Advanced ICT and smart systems for innovative "engineering, construction and architectural management". Dans: Engineering, Construction and Architectural Management, v. 22, n. 5 (septembre 2015).

    https://doi.org/10.1108/ecam-07-2015-0120

  10. Ekanayake, E. M. A. C. / Shen, Geoffrey / Kumaraswamy, Mohan M. (2021): Critical capabilities of improving supply chain resilience in industrialized construction in Hong Kong. Dans: Engineering, Construction and Architectural Management, v. 28, n. 10 (février 2021).

    https://doi.org/10.1108/ecam-05-2020-0295

  11. Kumaraswamy, Mohan M. / Dissanayaka, Sunil M. (2001): Developing a decision support system for building project procurement. Dans: Building and Environment, v. 36, n. 3 (avril 2001).

    https://doi.org/10.1016/s0360-1323(00)00011-1

  12. Dissanayaka, Sunil M. / Kumaraswamy, Mohan M. (1998): Comparing contributors to time and cost performance in building projects. Dans: Building and Environment, v. 34, n. 1 (janvier 1998).

    https://doi.org/10.1016/s0360-1323(97)00068-1

  13. Kumaraswamy, Mohan M. (1996): Contractor evaluation and selection: a Hong Kong perspective. Dans: Building and Environment, v. 31, n. 3 (mai 1996).

    https://doi.org/10.1016/0360-1323(95)00044-5

  14. Ling, Florence Yean Yng / Ibbs, C. William / Kumaraswamy, Mohan M. (2005): Enablers That Help Foreign Architectural, Engineering, and Construction Firms Win Construction Contracts in China. Dans: Journal of Management in Engineering (ASCE), v. 21, n. 2 (avril 2005).

    https://doi.org/10.1061/(asce)0742-597x(2005)21:2(63)

  15. Rahman, M. Motiar / Kumaraswamy, Mohan M. (2004): Contracting Relationship Trends and Transitions. Dans: Journal of Management in Engineering (ASCE), v. 20, n. 4 (octobre 2004).

    https://doi.org/10.1061/(asce)0742-597x(2004)20:4(147)

  16. Kumaraswamy, Mohan M. (1998): Consequences of Construction Conflict: A Hong Kong Perspective. Dans: Journal of Management in Engineering (ASCE), v. 14, n. 3 (mai 1998).

    https://doi.org/10.1061/(asce)0742-597x(1998)14:3(66)

  17. Kumaraswamy, Mohan M. (1997): Appropriate Appraisal and Apportionment of Megaproject Risks. Dans: Journal of Professional Issues in Engineering Education and Practice, v. 123, n. 2 (avril 1997).

    https://doi.org/10.1061/(asce)1052-3928(1997)123:2(51)

  18. Kumaraswamy, Mohan M. / Miller, Christopher J. / Rahman, M. Motiar / Pickernell, David G. / Thomas Ng, S. / Wong, Israel P. Y. (2006): Developing Web-based Tools for Teaching, Training, Learning and Development. The Role of Academic Institutions. Dans: Architectural Engineering and Design Management, v. 2, n. 1-2 (janvier 2006).

    https://doi.org/10.1080/17452007.2006.9684610

  19. Palaneeswaran, Ekambaram / Kumaraswamy, Mohan M. (2000): Contractor Selection for Design/Build Projects. Dans: Journal of Construction Engineering and Management, v. 126, n. 5 (octobre 2000).

    https://doi.org/10.1061/(asce)0733-9364(2000)126:5(331)

  20. Kumaraswamy, Mohan M. / Ling, Florence Yean / Rahman, M. Motiar / Phng, Siew Ting (2005): Constructing Relationally Integrated Teams. Dans: Journal of Construction Engineering and Management, v. 131, n. 10 (octobre 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:10(1076)

  21. Kumaraswamy, Mohan M. / Morris, David A. (2002): Build-Operate-Transfer-Type Procurement in Asian Megaprojects. Dans: Journal of Construction Engineering and Management, v. 128, n. 2 (avril 2002).

    https://doi.org/10.1061/(asce)0733-9364(2002)128:2(93)

  22. Wan, Sammy K. / Kumaraswamy, Mohan M. / Liu, Davis T. (2009): Contributors to Construction Debris from Electrical and Mechanical Work in Hong Kong Infrastructure Projects. Dans: Journal of Construction Engineering and Management, v. 135, n. 7 (juillet 2009).

    https://doi.org/10.1061/(asce)0733-9364(2009)135:7(637)

  23. Zheng, Daisy X. M. / Thomas Ng, S. / Kumaraswamy, Mohan M. (2004): Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization. Dans: Journal of Construction Engineering and Management, v. 130, n. 2 (avril 2004).

    https://doi.org/10.1061/(asce)0733-9364(2004)130:2(168)

  24. Zheng, Daisy X. M. / Thomas Ng, S. / Kumaraswamy, Mohan M. (2005): Applying Pareto Ranking and Niche Formation to Genetic Algorithm-Based Multiobjective Time–Cost Optimization. Dans: Journal of Construction Engineering and Management, v. 131, n. 1 (janvier 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:1(81)

  25. Anvuur, Aaron M. / Kumaraswamy, Mohan M. (2007): Conceptual Model of Partnering and Alliancing. Dans: Journal of Construction Engineering and Management, v. 133, n. 3 (mars 2007).

    https://doi.org/10.1061/(asce)0733-9364(2007)133:3(225)

  26. Anvuur, Aaron M. / Kumaraswamy, Mohan M. (2016): Effects of Teamwork Climate on Cooperation in Crossfunctional Temporary Multi-Organization Workgroups. Dans: Journal of Construction Engineering and Management, v. 142, n. 1 (janvier 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001029

  27. Rahman, M. Motiar / Kumaraswamy, Mohan M. (2005): Assembling integrated project teams for joint risk management. Dans: Construction Management and Economics, v. 23, n. 4 (mai 2005).

    https://doi.org/10.1080/01446190500040083

  28. Kumaraswamy, Mohan M. / Chan, Daniel W. M. (1998): Contributors to construction delays. Dans: Construction Management and Economics, v. 16, n. 1 (janvier 1998).

    https://doi.org/10.1080/014461998372556

  29. Yogeswaran, Kumaru / Kumaraswamy, Mohan M. / Miller, Douglas R. A. (1998): Claims for extensions of time in civil engineering projects. Dans: Construction Management and Economics, v. 16, n. 3 (mai 1998).

    https://doi.org/10.1080/014461998372312

  30. Rahman, M. Motiar / Kumaraswamy, Mohan M. / Ling, Florence Yean Yng (2007): Building a relational contracting culture and integrated teams. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 34, n. 1 (janvier 2007).

    https://doi.org/10.1139/l06-119

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine