0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Yoon, Jongsik / Kim, Kyungrai / Choi, Byungjoo (2022): Integrated Framework for Quantifying and Applying Nonworking Days to Planning and Scheduling for Determining Reasonable Construction Time. Dans: Journal of Management in Engineering (ASCE), v. 38, n. 4 (juillet 2022).

    https://doi.org/10.1061/(asce)me.1943-5479.0001054

  2. Yu, Ilhan / Kim, Kyungrai / Jung, Youngsoo / Chin, Sangyoon (2007): Comparable Performance Measurement System for Construction Companies. Dans: Journal of Management in Engineering (ASCE), v. 23, n. 3 (juillet 2007).

    https://doi.org/10.1061/(asce)0742-597x(2007)23:3(131)

  3. Kim, Kyungrai (2017): Project Performance Evaluation of Multi-prime Contracts in Comparison with General Contractor Contracts. Dans: Journal of Asian Architecture and Building Engineering, v. 16, n. 3 (septembre 2017).

    https://doi.org/10.3130/jaabe.16.613

  4. Nam, SungHoon / Lee, DooYong / Cho, BongHo / Kim, Kyungrai (2019): Integrated Management Software for Factory Production of Modular Buildings. Dans: Advances in Civil Engineering, v. 2019 ( 2019).

    https://doi.org/10.1155/2019/7693459

  5. Jung, Youngsoo / Chin, Sangyoon / Kim, Kyungrai (2004): Informatization Index for the Construction Industry. Dans: Journal of Computing in Civil Engineering, v. 18, n. 3 (juillet 2004).

    https://doi.org/10.1061/(asce)0887-3801(2004)18:3(267)

  6. Chin, Sangyoon / Kim, Kyungrai / Kim, Yea-Sang (2005): Generate-Select-Check Based Daily Reporting System. Dans: Journal of Computing in Civil Engineering, v. 19, n. 4 (octobre 2005).

    https://doi.org/10.1061/(asce)0887-3801(2005)19:4(412)

  7. Chin, Sangyoon / Kim, Kyungrai / Kim, Yea-Sang (2004): A process-based quality management information system. Dans: Automation in Construction, v. 13, n. 2 (mars 2004).

    https://doi.org/10.1016/j.autcon.2003.08.010

  8. Kim, Youngjae / Kim, Kyungrai / Shin, Dongwoo (2005): Delay Analysis Method Using Delay Section. Dans: Journal of Construction Engineering and Management, v. 131, n. 11 (novembre 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:11(1155)

  9. Kim, Eunjeong / Yu, Ilhan / Kim, Kihyun / Kim, Kyungrai (2011): Optimal set of safety education considering individual characteristics of construction workers. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 38, n. 5 (mai 2011).

    https://doi.org/10.1139/l11-024

  10. Han, Juyeoun / Kim, Kyungrai / Chin, Sangyoon / Shin, Dongwoo (2009): Decision-making support model for reusable construction materials in multiple project management. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 36, n. 2 (février 2009).

    https://doi.org/10.1139/l08-133

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine