- Integrated Framework for Quantifying and Applying Nonworking Days to Planning and Scheduling for Determining Reasonable Construction Time. In: Journal of Management in Engineering (ASCE), v. 38, n. 4 (Juli 2022). (2022):
- Comparable Performance Measurement System for Construction Companies. In: Journal of Management in Engineering (ASCE), v. 23, n. 3 (Juli 2007). (2007):
- Project Performance Evaluation of Multi-prime Contracts in Comparison with General Contractor Contracts. In: Journal of Asian Architecture and Building Engineering, v. 16, n. 3 (September 2017). (2017):
- (2019): Integrated Management Software for Factory Production of Modular Buildings. In: Advances in Civil Engineering, v. 2019 ( 2019).
- Informatization Index for the Construction Industry. In: Journal of Computing in Civil Engineering, v. 18, n. 3 (Juli 2004). (2004):
- Generate-Select-Check Based Daily Reporting System. In: Journal of Computing in Civil Engineering, v. 19, n. 4 (Oktober 2005). (2005):
- A process-based quality management information system. In: Automation in Construction, v. 13, n. 2 (März 2004). (2004):
- Delay Analysis Method Using Delay Section. In: Journal of Construction Engineering and Management, v. 131, n. 11 (November 2005). (2005):
- Optimal set of safety education considering individual characteristics of construction workers. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 38, n. 5 (Mai 2011). (2011):
- Decision-making support model for reusable construction materials in multiple project management. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 36, n. 2 (Februar 2009). (2009):