Kyunghwan Kim
- Real-Time Progress Management System for Steel Structure Construction. Dans: Journal of Asian Architecture and Building Engineering, v. 8, n. 1 (mai 2009). (2009):
- Ventilation Performance by the Concentration Change of HCHO and TVOC with Three Models of Two Ventilation Systems and One Natural Condition. Dans: Journal of Asian Architecture and Building Engineering, v. 8, n. 1 (mai 2009). (2009):
- Enhanced Resource Leveling Technique for Project Scheduling. Dans: Journal of Asian Architecture and Building Engineering, v. 4, n. 2 (novembre 2005). (2005):
- A laser-technology-based lifting-path tracking system for a robotic tower crane. Dans: Automation in Construction, v. 18, n. 7 (novembre 2009). (2009):
- Phantom Float. Dans: Journal of Construction Engineering and Management, v. 129, n. 5 (octobre 2003). (2003):
- Evaluation of the Resource-Constrained Critical Path Method Algorithms. Dans: Journal of Construction Engineering and Management, v. 131, n. 5 (mai 2005). (2005):
- Delay analysis in resource-constrained schedules. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 36, n. 2 (février 2009). (2009):
- Identifying logical dummy activities in an activity-on-arrow network. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 35, n. 7 (juillet 2008). (2008):