Kyunghwan Kim
- Real-Time Progress Management System for Steel Structure Construction. In: Journal of Asian Architecture and Building Engineering, v. 8, n. 1 (Mai 2009). (2009):
- Ventilation Performance by the Concentration Change of HCHO and TVOC with Three Models of Two Ventilation Systems and One Natural Condition. In: Journal of Asian Architecture and Building Engineering, v. 8, n. 1 (Mai 2009). (2009):
- Enhanced Resource Leveling Technique for Project Scheduling. In: Journal of Asian Architecture and Building Engineering, v. 4, n. 2 (November 2005). (2005):
- A laser-technology-based lifting-path tracking system for a robotic tower crane. In: Automation in Construction, v. 18, n. 7 (November 2009). (2009):
- Phantom Float. In: Journal of Construction Engineering and Management, v. 129, n. 5 (Oktober 2003). (2003):
- Evaluation of the Resource-Constrained Critical Path Method Algorithms. In: Journal of Construction Engineering and Management, v. 131, n. 5 (Mai 2005). (2005):
- Delay analysis in resource-constrained schedules. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 36, n. 2 (Februar 2009). (2009):
- Identifying logical dummy activities in an activity-on-arrow network. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 35, n. 7 (Juli 2008). (2008):