- Estimating Hypothetical Competitive Bid Price on Bid-rigged Projects Based on the Weights of Major Work Groups. Dans: KSCE Journal of Civil Engineering, v. 28, n. 8 (22 juin 2024). (2024):
- (2022): Application Issues of Impacted As-Planned Schedule for Delay Analysis. Dans: Buildings, v. 12, n. 9 (16 septembre 2022).
- Blockchain-Based Automatic Tracking and Extracting Construction Document for Claim and Dispute Support. Dans: KSCE Journal of Civil Engineering, v. 26, n. 9 (1 août 2022). (2022):
- Estimating Damages of Bid-Rigging in Design-Build Contracts Based on Simulation Model. Dans: KSCE Journal of Civil Engineering, v. 25, n. 5 (12 mars 2021). (2021):
- Performance assessment of repair material for deteriorated concrete slabs using chemically bonded cement. Dans: Construction and Building Materials, v. 237 (mars 2020). (2020):
- Valuation on the Intangible Benefits of EVMS using CVM. Dans: Journal of Asian Architecture and Building Engineering, v. 9, n. 1 (mai 2010). (2010):
- Case Study on the Evaluation of Equipment Flow at a Construction Site. Dans: Journal of Computing in Civil Engineering, v. 24, n. 6 (novembre 2010). (2010):
- Preliminary Cost Estimation Model Using Case-Based Reasoning and Genetic Algorithms. Dans: Journal of Computing in Civil Engineering, v. 24, n. 6 (novembre 2010). (2010):
- Schedule compression in tunneling projects by adjusting workflow variability. Dans: KSCE Journal of Civil Engineering, v. 18, n. 6 (août 2014). (2014):
- Approximate cost estimating model for PSC Beam bridge based on quantity of standard work. Dans: KSCE Journal of Civil Engineering, v. 13, n. 6 (septembre 2009). (2009):
- Assessment model on environmental economics for construction projects in Korea. Dans: KSCE Journal of Civil Engineering, v. 16, n. 4 (avril 2012). (2012):
- Multi-agent-based simulation system for construction operations with congested flows. Dans: Automation in Construction, v. 19, n. 7 (novembre 2010). (2010):