- Estimating Hypothetical Competitive Bid Price on Bid-rigged Projects Based on the Weights of Major Work Groups. In: KSCE Journal of Civil Engineering, v. 28, n. 8 (22 Juni 2024). (2024):
- (2022): Application Issues of Impacted As-Planned Schedule for Delay Analysis. In: Buildings, v. 12, n. 9 (16 September 2022).
- Blockchain-Based Automatic Tracking and Extracting Construction Document for Claim and Dispute Support. In: KSCE Journal of Civil Engineering, v. 26, n. 9 (1 August 2022). (2022):
- Estimating Damages of Bid-Rigging in Design-Build Contracts Based on Simulation Model. In: KSCE Journal of Civil Engineering, v. 25, n. 5 (12 März 2021). (2021):
- Performance assessment of repair material for deteriorated concrete slabs using chemically bonded cement. In: Construction and Building Materials, v. 237 (März 2020). (2020):
- Valuation on the Intangible Benefits of EVMS using CVM. In: Journal of Asian Architecture and Building Engineering, v. 9, n. 1 (Mai 2010). (2010):
- Case Study on the Evaluation of Equipment Flow at a Construction Site. In: Journal of Computing in Civil Engineering, v. 24, n. 6 (November 2010). (2010):
- Preliminary Cost Estimation Model Using Case-Based Reasoning and Genetic Algorithms. In: Journal of Computing in Civil Engineering, v. 24, n. 6 (November 2010). (2010):
- Schedule compression in tunneling projects by adjusting workflow variability. In: KSCE Journal of Civil Engineering, v. 18, n. 6 (August 2014). (2014):
- Approximate cost estimating model for PSC Beam bridge based on quantity of standard work. In: KSCE Journal of Civil Engineering, v. 13, n. 6 (September 2009). (2009):
- Assessment model on environmental economics for construction projects in Korea. In: KSCE Journal of Civil Engineering, v. 16, n. 4 (April 2012). (2012):
- Multi-agent-based simulation system for construction operations with congested flows. In: Automation in Construction, v. 19, n. 7 (November 2010). (2010):