Dariusz Jurkowski
- Bridge Falsework in Staged Construction of a Prestressed Concrete Beam Bridge. Dans: Journal of Civil Engineering and Architecture, v. 9, n. 12 (décembre 2015). (2015):
- Refurbishment of a Footbridge at a Railway Station Junction. Présenté pendant: Footbridge 2014 - Past, Present & Future, London, 16-18 July 2014. (2014):