0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Okudan, Ozan / Demirdögen, Gökhan / Işik, Zeynep: A decision-support framework for suspension of public infrastructure projects: a combined use of neutrosophic AHP and TOPSIS. Dans: Engineering, Construction and Architectural Management.

    https://doi.org/10.1108/ecam-08-2023-0795

  2. Altan, Ebru / Işik, Zeynep: Digital twins in lean construction: a neutrosophic AHP – BOCR analysis approach. Dans: Engineering, Construction and Architectural Management.

    https://doi.org/10.1108/ecam-11-2022-1115

  3. Okudan, Ozan / Çevikbas, Murat / Işik, Zeynep: Selection framework of disruption analysis methods for megaprojects: an integrated fuzzy multi-criteria decision-making approach. Dans: Engineering, Construction and Architectural Management.

    https://doi.org/10.1108/ecam-02-2023-0105

  4. Koc, Kerim / Ekmekcioğlu, Ömer / Işik, Zeynep (2023): Developing a Hybrid Fuzzy Decision-Making Model for Sustainable Circular Contractor Selection. Dans: Journal of Construction Engineering and Management, v. 149, n. 10 (octobre 2023).

    https://doi.org/10.1061/jcemd4.coeng-13305

  5. Çevikbas, Murat / Okudan, Ozan / Işik, Zeynep (2023): Determination of the Most Appropriate Alternative Dispute Resolution Methods for Airport Projects: A Fuzzy VIKOR Approach. Dans: KSCE Journal of Civil Engineering, v. 27, n. 8 (juin 2023).

    https://doi.org/10.1007/s12205-023-1864-4

  6. Başaran, Yunus / Aladağ, Hande / Işik, Zeynep (2023): Pythagorean Fuzzy AHP Based Dynamic Subcontractor Management Framework. Dans: Buildings, v. 13, n. 5 (27 avril 2023).

    https://doi.org/10.3390/buildings13051351

  7. Demirdögen, Gökhan / Işik, Zeynep / Arayici, Yusuf (2023): BIM-based big data analytic system for healthcare facility management. Dans: Journal of Building Engineering, v. 64 (avril 2023).

    https://doi.org/10.1016/j.jobe.2022.105713

  8. Çevikbas, Murat / Okudan, Ozan / Işik, Zeynep (2022): Identification and assessment of disruption claim management risks in construction projects: a life cycle-based approach. Dans: Engineering, Construction and Architectural Management, v. 31, n. 1 (septembre 2022).

    https://doi.org/10.1108/ecam-05-2022-0470

  9. Çevikbas, Murat / Okudan, Ozan / Işik, Zeynep (2022): New Delay-Analysis Method Using Modified Schedule and Modified Updated Schedule for Construction Projects. Dans: Journal of Construction Engineering and Management, v. 148, n. 11 (novembre 2022).

    https://doi.org/10.1061/(asce)co.1943-7862.0002394

  10. Aladağ, Hande / Demirdögen, Gökhan / Işik, Zeynep (2016): Building Information Modeling (BIM) Use in Turkish Construction Industry. Dans: Procedia Engineering, v. 161 ( 2016).

    https://doi.org/10.1016/j.proeng.2016.08.520

  11. Çevikbas, Murat / Işik, Zeynep (2022): Detecting the most appropriate delay analysis methods for mega airport projects. Dans: Engineering, Construction and Architectural Management, v. 30, n. 6 (août 2022).

    https://doi.org/10.1108/ecam-12-2021-1107

  12. Aladağ, Hande / Işik, Zeynep (2022): Political and Legal Risks in Public-Private-Partnership Mega Transportation Projects. Dans: Proceedings of the Institution of Civil Engineers - Municipal Engineer, v. 175, n. 2 (juin 2022).

    https://doi.org/10.1680/jmuen.21.00017

  13. Aladağ, Hande / Işik, Zeynep (2022): Multi Agent System Based Risk Allocation Model for Public-Private-Partnership Type Projects (RAMP3). Dans: Teknik Dergi, v. 33, n. 4 (juillet 2022).

    https://doi.org/10.18400/tekderg.745510

  14. Çevikbas, Murat / Işik, Zeynep (2021): An Overarching Review on Delay Analyses in Construction Projects. Dans: Buildings, v. 11, n. 3 (27 février 2021).

    https://doi.org/10.3390/buildings11030109

  15. Işik, Zeynep / Arditi, David / Dilmen, Irem / Birgonul, M. Talat (2010): The role of exogenous factors in the strategic performance of construction companies. Dans: Engineering, Construction and Architectural Management, v. 17, n. 2 (mars 2010).

    https://doi.org/10.1108/09699981011024650

  16. Aladağ, Hande / Işik, Zeynep (2019): Design and construction risks in BOT type mega transportation projects. Dans: Engineering, Construction and Architectural Management, v. 26, n. 10 (octobre 2019).

    https://doi.org/10.1108/ecam-08-2018-0351

  17. Işik, Zeynep / Budayan, Cenk / Aladağ, Hande / Demirdögen, Gökhan / Yilmaz, Tamer / Arditi, David (2019): İnşaat Sektöründe Mesleki Eğitim Performans Göstergeleri. Dans: Teknik Dergi, v. 30, n. 3 (mai 2019).

    https://doi.org/10.18400/tekderg.362251

  18. Demirdögen, Gökhan / Işik, Zeynep (2021): Structural Equation Model of the Factors Affecting Construction Industry Innovation Success. Dans: Teknik Dergi, v. 32, n. 2 (mars 2021).

    https://doi.org/10.18400/tekderg.567272

  19. Aladağ, Hande / Işik, Zeynep (2017): Role of Financial Risks in BOT Megatransportation Projects in Developing Countries. Dans: Journal of Management in Engineering (ASCE), v. 33, n. 4 (juillet 2017).

    https://doi.org/10.1061/(asce)me.1943-5479.0000527

  20. Işik, Zeynep / Arditi, David / Dikmen, Irem / Birgonul, M. Talat (2010): Impact of Resources and Strategies on Construction Company Performance. Dans: Journal of Management in Engineering (ASCE), v. 26, n. 1 (janvier 2010).

    https://doi.org/10.1061/(asce)0742-597x(2010)26:1(9)

  21. Işik, Zeynep / Aladağ, Hande (2017): A fuzzy AHP model to assess sustainable performance of the construction industry from urban regeneration perspective. Dans: Journal of Civil Engineering and Management, v. 23, n. 4 (avril 2017).

    https://doi.org/10.3846/13923730.2016.1210219

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine