New Delay-Analysis Method Using Modified Schedule and Modified Updated Schedule for Construction Projects
Auteur(s): |
Murat Çevikbas
Ozan Okudan Zeynep Işik |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Construction Engineering and Management, novembre 2022, n. 11, v. 148 |
DOI: | 10.1061/(asce)co.1943-7862.0002394 |
- Informations
sur cette fiche - Reference-ID
10690765 - Publié(e) le:
23.09.2022 - Modifié(e) le:
23.09.2022