La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Ibbs, William (2012): Measured-Mile Principles. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 4, n. 2 (mai 2012).

    https://doi.org/10.1061/(asce)la.1943-4170.0000087

  2. Ibbs, William / Gentele, Oskar (2021): Usage and Acceptance Rates for Loss of Productivity Damage Quantification Methods. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 13, n. 2 (mai 2021).

    https://doi.org/10.1061/(asce)la.1943-4170.0000472

  3. Ibbs, William (2021): Update on Quantitative Analysis of Change and Loss of Productivity. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 13, n. 1 (février 2021).

    https://doi.org/10.1061/(asce)la.1943-4170.0000447

  4. Ibbs, William / Kang, Jung Mo (2018): Weather-Related Delay Provisions in Public Transportation Construction Contracts. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 10, n. 3 (août 2018).

    https://doi.org/10.1061/(asce)la.1943-4170.0000259

  5. Ibbs, William / Berry, Mark / Sun, Xiaodan (2017): Visualizing Skipped and Out-of-Sequence Work. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 9, n. 4 (novembre 2017).

    https://doi.org/10.1061/(asce)la.1943-4170.0000240

  6. Ibbs, William / Sun, Xiaodan (2017): Weather’s Effect on Construction Labor Productivity. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 9, n. 2 (mai 2017).

    https://doi.org/10.1061/(asce)la.1943-4170.0000212

  7. Davis, Benjamin T. / Ibbs, William (2017): Guidelines for Recovering Home Office Overhead Costs with Emphasis on the Eichleay Formula. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 9, n. 1 (février 2017).

    https://doi.org/10.1061/(asce)la.1943-4170.0000201

  8. Ibbs, William / Chittick, Josh (2017): Practical Ways to Identify Measured Miles. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 9, n. 1 (février 2017).

    https://doi.org/10.1061/(asce)la.1943-4170.0000199

  9. Ibbs, William / Sun, Xiaodan (2016): Use of Mechanical Contractors Association of America Method in Loss of Productivity Claims. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 8, n. 4 (novembre 2016).

    https://doi.org/10.1061/(asce)la.1943-4170.0000196

  10. Ibbs, William / Chen, Chao (2015): Proactive Project Change-Prediction Tool. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 7, n. 4 (novembre 2015).

    https://doi.org/10.1061/(asce)la.1943-4170.0000175

  11. Ibbs, William / Baker, Benjamin / Burckhardt, Fiona (2015): Process Model for Identifying and Computing Allowable Home Office Overhead Cost Claims. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 7, n. 3 (août 2015).

    https://doi.org/10.1061/(asce)la.1943-4170.0000164

  12. Ibbs, William / Razavi, Pirouzan (2014): Foreseeability in Construction. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 6, n. 4 (novembre 2014).

    https://doi.org/10.1061/(asce)la.1943-4170.0000161

  13. Ibbs, William (2013): Thinking about Delay, Disruption, and the Cumulative Impact of Multiple Changes. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 5, n. 3 (août 2013).

    https://doi.org/10.1061/(asce)la.1943-4170.0000126

  14. Ibbs, William (2012): Construction Change: Likelihood, Severity, and Impact on Productivity. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 4, n. 3 (août 2012).

    https://doi.org/10.1061/(asce)la.1943-4170.0000089

  15. Liu, Min / Ballard, Glenn / Ibbs, William (2011): Work Flow Variation and Labor Productivity: Case Study. Dans: Journal of Management in Engineering (ASCE), v. 27, n. 4 (octobre 2011).

    https://doi.org/10.1061/(asce)me.1943-5479.0000056

  16. Chang, Andrew S. / Ibbs, William (2006): System Model for Analyzing Design Productivity. Dans: Journal of Management in Engineering (ASCE), v. 22, n. 1 (janvier 2006).

    https://doi.org/10.1061/(asce)0742-597x(2006)22:1(27)

  17. Ibbs, William / Nguyen, Long D. / Lee, Seulkee (2007): Quantified Impacts of Project Change. Dans: Journal of Professional Issues in Engineering Education and Practice, v. 133, n. 1 (janvier 2007).

    https://doi.org/10.1061/(asce)1052-3928(2007)133:1(45)

  18. Nguyen, Long D. / Kneppers, Jax / García de Soto, Borja / Ibbs, William (2010): Analysis of Adverse Weather for Excusable Delays. Dans: Journal of Construction Engineering and Management, v. 136, n. 12 (décembre 2010).

    https://doi.org/10.1061/(asce)co.1943-7862.0000242

  19. Ibbs, William / Nguyen, Long D. (2007): Alternative for Quantifying Field-Overhead Damages. Dans: Journal of Construction Engineering and Management, v. 133, n. 10 (octobre 2007).

    https://doi.org/10.1061/(asce)0733-9364(2007)133:10(736)

  20. Nguyen, Long D. / Ibbs, William (2008): FLORA: New Forensic Schedule Analysis Technique. Dans: Journal of Construction Engineering and Management, v. 134, n. 7 (juillet 2008).

    https://doi.org/10.1061/(asce)0733-9364(2008)134:7(483)

  21. Ibbs, William / Nguyen, Long D. / Simonian, Lonny (2011): Concurrent Delays and Apportionment of Damages. Dans: Journal of Construction Engineering and Management, v. 137, n. 2 (février 2011).

    https://doi.org/10.1061/(asce)co.1943-7862.0000259

  22. Ibbs, William / Nguyen, Long D. (2007): Schedule Analysis under the Effect of Resource Allocation. Dans: Journal of Construction Engineering and Management, v. 133, n. 2 (février 2007).

    https://doi.org/10.1061/(asce)0733-9364(2007)133:2(131)

  23. Ibbs, William / Liu, Min (2005): Improved Measured Mile Analysis Technique. Dans: Journal of Construction Engineering and Management, v. 131, n. 12 (décembre 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:12(1249)

  24. Ibbs, William (2005): Impact of Change's Timing on Labor Productivity. Dans: Journal of Construction Engineering and Management, v. 131, n. 11 (novembre 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:11(1219)

  25. Nguyen, Long D. / Ibbs, William (2010): Case Law and Variations in Cumulative Impact Productivity Claims. Dans: Journal of Construction Engineering and Management, v. 136, n. 8 (août 2010).

    https://doi.org/10.1061/(asce)co.1943-7862.0000193

  26. Ibbs, William (2012): Commercial Conflict Management and Dispute Resolution. Dans: Construction Management and Economics, v. 30, n. 4 (avril 2012).

    https://doi.org/10.1080/01446193.2012.665172

  27. Chang, Andrew S. / Shen, Fang-Ying / Ibbs, William (2010): Design and construction coordination problems and planning for design–build project new users. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 37, n. 12 (décembre 2010).

    https://doi.org/10.1139/l10-090

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine