-
Ibbs, William (2012): Measured-Mile Principles. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 4, n. 2 (mai 2012).
https://doi.org/10.1061/(asce)la.1943-4170.0000087
-
Ibbs, William / Gentele, Oskar (2021): Usage and Acceptance Rates for Loss of Productivity Damage Quantification Methods. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 13, n. 2 (mai 2021).
https://doi.org/10.1061/(asce)la.1943-4170.0000472
-
Ibbs, William (2021): Update on Quantitative Analysis of Change and Loss of Productivity. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 13, n. 1 (février 2021).
https://doi.org/10.1061/(asce)la.1943-4170.0000447
-
Ibbs, William / Kang, Jung Mo (2018): Weather-Related Delay Provisions in Public Transportation Construction Contracts. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 10, n. 3 (août 2018).
https://doi.org/10.1061/(asce)la.1943-4170.0000259
-
Ibbs, William / Berry, Mark / Sun, Xiaodan (2017): Visualizing Skipped and Out-of-Sequence Work. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 9, n. 4 (novembre 2017).
https://doi.org/10.1061/(asce)la.1943-4170.0000240
-
Ibbs, William / Sun, Xiaodan (2017): Weather’s Effect on Construction Labor Productivity. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 9, n. 2 (mai 2017).
https://doi.org/10.1061/(asce)la.1943-4170.0000212
-
Davis, Benjamin T. / Ibbs, William (2017): Guidelines for Recovering Home Office Overhead Costs with Emphasis on the Eichleay Formula. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 9, n. 1 (février 2017).
https://doi.org/10.1061/(asce)la.1943-4170.0000201
-
Ibbs, William / Chittick, Josh (2017): Practical Ways to Identify Measured Miles. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 9, n. 1 (février 2017).
https://doi.org/10.1061/(asce)la.1943-4170.0000199
-
Ibbs, William / Sun, Xiaodan (2016): Use of Mechanical Contractors Association of America Method in Loss of Productivity Claims. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 8, n. 4 (novembre 2016).
https://doi.org/10.1061/(asce)la.1943-4170.0000196
-
Ibbs, William / Chen, Chao (2015): Proactive Project Change-Prediction Tool. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 7, n. 4 (novembre 2015).
https://doi.org/10.1061/(asce)la.1943-4170.0000175
-
Ibbs, William / Baker, Benjamin / Burckhardt, Fiona (2015): Process Model for Identifying and Computing Allowable Home Office Overhead Cost Claims. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 7, n. 3 (août 2015).
https://doi.org/10.1061/(asce)la.1943-4170.0000164
-
Ibbs, William / Razavi, Pirouzan (2014): Foreseeability in Construction. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 6, n. 4 (novembre 2014).
https://doi.org/10.1061/(asce)la.1943-4170.0000161
-
Ibbs, William (2013): Thinking about Delay, Disruption, and the Cumulative Impact of Multiple Changes. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 5, n. 3 (août 2013).
https://doi.org/10.1061/(asce)la.1943-4170.0000126
-
Ibbs, William (2012): Construction Change: Likelihood, Severity, and Impact on Productivity. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 4, n. 3 (août 2012).
https://doi.org/10.1061/(asce)la.1943-4170.0000089
-
Liu, Min / Ballard, Glenn / Ibbs, William (2011): Work Flow Variation and Labor Productivity: Case Study. Dans: Journal of Management in Engineering (ASCE), v. 27, n. 4 (octobre 2011).
https://doi.org/10.1061/(asce)me.1943-5479.0000056
-
Chang, Andrew S. / Ibbs, William (2006): System Model for Analyzing Design Productivity. Dans: Journal of Management in Engineering (ASCE), v. 22, n. 1 (janvier 2006).
https://doi.org/10.1061/(asce)0742-597x(2006)22:1(27)
-
Ibbs, William / Nguyen, Long D. / Lee, Seulkee (2007): Quantified Impacts of Project Change. Dans: Journal of Professional Issues in Engineering Education and Practice, v. 133, n. 1 (janvier 2007).
https://doi.org/10.1061/(asce)1052-3928(2007)133:1(45)
-
Nguyen, Long D. / Kneppers, Jax / García de Soto, Borja / Ibbs, William (2010): Analysis of Adverse Weather for Excusable Delays. Dans: Journal of Construction Engineering and Management, v. 136, n. 12 (décembre 2010).
https://doi.org/10.1061/(asce)co.1943-7862.0000242
-
Ibbs, William / Nguyen, Long D. (2007): Alternative for Quantifying Field-Overhead Damages. Dans: Journal of Construction Engineering and Management, v. 133, n. 10 (octobre 2007).
https://doi.org/10.1061/(asce)0733-9364(2007)133:10(736)
-
Nguyen, Long D. / Ibbs, William (2008): FLORA: New Forensic Schedule Analysis Technique. Dans: Journal of Construction Engineering and Management, v. 134, n. 7 (juillet 2008).
https://doi.org/10.1061/(asce)0733-9364(2008)134:7(483)
-
Ibbs, William / Nguyen, Long D. / Simonian, Lonny (2011): Concurrent Delays and Apportionment of Damages. Dans: Journal of Construction Engineering and Management, v. 137, n. 2 (février 2011).
https://doi.org/10.1061/(asce)co.1943-7862.0000259
-
Ibbs, William / Nguyen, Long D. (2007): Schedule Analysis under the Effect of Resource Allocation. Dans: Journal of Construction Engineering and Management, v. 133, n. 2 (février 2007).
https://doi.org/10.1061/(asce)0733-9364(2007)133:2(131)
-
Ibbs, William / Liu, Min (2005): Improved Measured Mile Analysis Technique. Dans: Journal of Construction Engineering and Management, v. 131, n. 12 (décembre 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:12(1249)
-
Ibbs, William (2005): Impact of Change's Timing on Labor Productivity. Dans: Journal of Construction Engineering and Management, v. 131, n. 11 (novembre 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:11(1219)
-
Nguyen, Long D. / Ibbs, William (2010): Case Law and Variations in Cumulative Impact Productivity Claims. Dans: Journal of Construction Engineering and Management, v. 136, n. 8 (août 2010).
https://doi.org/10.1061/(asce)co.1943-7862.0000193
-
Ibbs, William (2012): Commercial Conflict Management and Dispute Resolution. Dans: Construction Management and Economics, v. 30, n. 4 (avril 2012).
https://doi.org/10.1080/01446193.2012.665172
-
Chang, Andrew S. / Shen, Fang-Ying / Ibbs, William (2010): Design and construction coordination problems and planning for design–build project new users. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 37, n. 12 (décembre 2010).
https://doi.org/10.1139/l10-090