Visualizing Skipped and Out-of-Sequence Work
Auteur(s): |
William Ibbs
(Professor of Construction Management, Dept. of Civil and Environmental Engineering, Univ. of California, Berkeley, CA 94720; President, The Ibbs Consulting Group, Oakland, CA 94618 (corresponding author).)
Mark Berry (President, Delta CPM, 1015 27th St., Sacramento, CA 95816.) Xiaodan Sun (Ph.D. Candidate, Dept. of Civil and Environmental Engineering, Univ. of California, Berkeley, CA 94720.) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, novembre 2017, n. 4, v. 9 |
Page(s): | 05017006 |
DOI: | 10.1061/(asce)la.1943-4170.0000240 |
- Informations
sur cette fiche - Reference-ID
10579869 - Publié(e) le:
08.03.2021 - Modifié(e) le:
08.03.2021