- Visualising a framework for enhancing material circularity in building construction projects: Drivers, barriers, and strategies. Dans: Building and Environment, v. 253 (avril 2024). (2024):
- Identification and analysis of communication barriers for construction projects with time uncertainties. Dans: Engineering, Construction and Architectural Management. :
- Graph-Based Automated Construction Scheduling without the Use of BIM. Dans: Journal of Construction Engineering and Management, v. 149, n. 2 (février 2023). (2023):
- Optimising the implementation of BIM: A 2-stage stochastic programming approach. Dans: Automation in Construction, v. 136 (avril 2022). (2022):
- Construction schedule risk analysis – a hybrid machine learning approach. Dans: Journal of Information Technology in Construction, v. 27 (janvier 2022). (2022):
- Analysis of User Needs in Time-Related Risk Management for Holistic Project Understanding. Dans: Journal of Construction Engineering and Management, v. 148, n. 4 (avril 2022). (2022):
- Comparing Natural Language Processing Methods to Cluster Construction Schedules. Dans: Journal of Construction Engineering and Management, v. 147, n. 10 (octobre 2021). (2021):
- BIM adoption model for small and medium construction organisations in Australia. Dans: Engineering, Construction and Architectural Management, v. 26, n. 2 (mars 2019). (2019):
- A neural network approach to predicting the net costs associated with BIM adoption. Dans: Automation in Construction, v. 119 (novembre 2020). (2020):
- Comparative Modeling Approach to Capture the Differences in BIM Adoption Decision-Making Process in Australia and China. Dans: Journal of Construction Engineering and Management, v. 146, n. 2 (février 2020). (2020):
- Impact of organization size and project type on BIM adoption in the Chinese construction market. Dans: Construction Management and Economics, v. 37, n. 11 (mars 2019). (2019):