A neural network approach to predicting the net costs associated with BIM adoption
Auteur(s): |
Ying Hong
Ahmed W. A. Hammad Ali Akbarnezhad Mehrdad Arashpour |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Automation in Construction, novembre 2020, v. 119 |
Page(s): | 103306 |
DOI: | 10.1016/j.autcon.2020.103306 |
- Informations
sur cette fiche - Reference-ID
10426862 - Publié(e) le:
13.07.2020 - Modifié(e) le:
13.07.2020