Mohamed Y. Hegab
- Developing a Complexity Measure for Project Schedules. Dans: Journal of Construction Engineering and Management, v. 132, n. 6 (juin 2006). (2006):
- Delay Time Analysis in Microtunneling Projects. Dans: Journal of Construction Engineering and Management, v. 133, n. 2 (février 2007). (2007):
- Experimental Study on the Effect of Spliced Reinforcement in High Strength Concrete Beams. Dans: Advances in Structural Engineering, v. 8, n. 1 (janvier 2005). (2005):
- Using Weibull Analysis for Evaluation of Cost and Schedule Performance. Dans: Journal of Construction Engineering and Management, v. 131, n. 12 (décembre 2005). (2005):
- Evaluating Cost Overruns of Asphalt Paving Project Using Statistical Process Control Methods. Dans: Journal of Construction Engineering and Management, v. 131, n. 11 (novembre 2005). (2005):
- Decision Support System for Commencement Delay Claims. Dans: Practice Periodical on Structural Design and Construction, v. 10, n. 3 (août 2005). (2005):
- Productivity Analysis for Boulac's Wastewater Microtunnels in Egypt. Dans: Practice Periodical on Structural Design and Construction, v. 9, n. 2 (mai 2004). (2004):