Mohamed Y. Hegab
- Developing a Complexity Measure for Project Schedules. In: Journal of Construction Engineering and Management, v. 132, n. 6 (Juni 2006). (2006):
- Delay Time Analysis in Microtunneling Projects. In: Journal of Construction Engineering and Management, v. 133, n. 2 (Februar 2007). (2007):
- Experimental Study on the Effect of Spliced Reinforcement in High Strength Concrete Beams. In: Advances in Structural Engineering, v. 8, n. 1 (Januar 2005). (2005):
- Using Weibull Analysis for Evaluation of Cost and Schedule Performance. In: Journal of Construction Engineering and Management, v. 131, n. 12 (Dezember 2005). (2005):
- Evaluating Cost Overruns of Asphalt Paving Project Using Statistical Process Control Methods. In: Journal of Construction Engineering and Management, v. 131, n. 11 (November 2005). (2005):
- Decision Support System for Commencement Delay Claims. In: Practice Periodical on Structural Design and Construction, v. 10, n. 3 (August 2005). (2005):
- Productivity Analysis for Boulac's Wastewater Microtunnels in Egypt. In: Practice Periodical on Structural Design and Construction, v. 9, n. 2 (Mai 2004). (2004):