- Rate Fixing in Civil Engineering Contracts. Dans: Proceedings of the Institution of Civil Engineers, v. 24, n. 2 (février 1963). (1963):
- The New Buenos Aires Power Station. Dans: Proceedings of the Institution of Civil Engineers, v. 29, n. 1 (septembre 1964). (1964):
- The Driving and Testing of Piles. Dans: Proceedings of the Institution of Civil Engineers, v. 2, n. 1 (janvier 1953). (1953):
- Tunnel under the Severn and Wye Estuaries. Dans: Proceedings of the Institution of Civil Engineers, v. 54, n. 3 (août 1973). (1973):
- Hong Kong Mass Transit Railway Modified Initial System: Design and Construction of the Driven Tunnels and the Immersed Tube. Dans: Proceedings of the Institution of Civil Engineers, v. 68, n. 4 (novembre 1980). (1980):
- Clyde Tunnel: Design, Construction and Tunnel Services. Dans: Proceedings of the Institution of Civil Engineers, v. 30, n. 2 (février 1965). (1965):
- Portishead 'B' Power Station, with Particular Reference to the Circulating-Water Works. Dans: Proceedings of the Institution of Civil Engineers, v. 7, n. 4 (août 1957). (1957):
- Thames Cable Tunnel. Dans: Proceedings of the Institution of Civil Engineers, v. 44, n. 4 (décembre 1969). (1969):