C. K. Haswell
- Rate Fixing in Civil Engineering Contracts. In: Proceedings of the Institution of Civil Engineers, v. 24, n. 2 (Februar 1963). (1963):
- The New Buenos Aires Power Station. In: Proceedings of the Institution of Civil Engineers, v. 29, n. 1 (September 1964). (1964):
- The Driving and Testing of Piles. In: Proceedings of the Institution of Civil Engineers, v. 2, n. 1 (Januar 1953). (1953):
- Tunnel under the Severn and Wye Estuaries. In: Proceedings of the Institution of Civil Engineers, v. 54, n. 3 (August 1973). (1973):
- Hong Kong Mass Transit Railway Modified Initial System: Design and Construction of the Driven Tunnels and the Immersed Tube. In: Proceedings of the Institution of Civil Engineers, v. 68, n. 4 (November 1980). (1980):
- Clyde Tunnel: Design, Construction and Tunnel Services. In: Proceedings of the Institution of Civil Engineers, v. 30, n. 2 (Februar 1965). (1965):
- Portishead 'B' Power Station, with Particular Reference to the Circulating-Water Works. In: Proceedings of the Institution of Civil Engineers, v. 7, n. 4 (August 1957). (1957):
- Thames Cable Tunnel. In: Proceedings of the Institution of Civil Engineers, v. 44, n. 4 (Dezember 1969). (1969):