Sangwon Han
- Identification and Reduction of Synchronous Replacements in Life-Cycle Cost Analysis of Equipment. Dans: Journal of Management in Engineering (ASCE), v. 35, n. 1 (janvier 2019). (2019):
- Accident Risk Identification and its Impact Analyses for Strategic Construction Safety Management. Dans: Journal of Civil Engineering and Management, v. 21, n. 4 (mars 2015). (2015):
- A Real-time Location-based Construction Labor Safety Management System. Dans: Journal of Civil Engineering and Management, v. 20, n. 5 (octobre 2014). (2014):
- Classification and Occurrence of Defective Acts in Residential Construction Projects. Dans: Journal of Civil Engineering and Management, v. 20, n. 2 (avril 2014). (2014):
- Integrating Construction Operation and Context in Large-Scale Construction Using Hybrid Computer Simulation. Dans: Journal of Computing in Civil Engineering, v. 23, n. 2 (mars 2009). (2009):
- A model-based productivity improvement of reinforced concrete work in a multi-housing project. Dans: KSCE Journal of Civil Engineering, v. 19, n. 5 (février 2015). (2015):
- Floor-Level Construction Material Layout Planning Model Considering Actual Travel Path. Dans: Journal of Construction Engineering and Management, v. 138, n. 7 (juillet 2012). (2012):
- Analysis of Causes of Construction Defects Using Fault Trees and Risk Importance Measures. Dans: Journal of Construction Engineering and Management, v. 139, n. 7 (juillet 2013). (2013):
- Relationship between Unsafe Working Conditions and Workers' Behavior and Impact of Working Conditions on Injury Severity in U.S. Construction Industry. Dans: Journal of Construction Engineering and Management, v. 139, n. 7 (juillet 2013). (2013):
- Lifting demand-based zoning for minimizing worker vertical transportation time in high-rise building construction. Dans: Automation in Construction, v. 32 (juillet 2013). (2013):
- Supply chain management model for ready mixed concrete. Dans: Automation in Construction, v. 20, n. 1 (janvier 2011). (2011):
- Project Pathogens Network: New Approach to Analyzing Construction-Defects-Generation Mechanisms. Dans: Journal of Construction Engineering and Management, v. 140, n. 1 (janvier 2014). (2014):
- Strategic-Operational Construction Management: Hybrid System Dynamics and Discrete Event Approach. Dans: Journal of Construction Engineering and Management, v. 134, n. 9 (septembre 2008). (2008):
- Application of Case-Based Reasoning for Estimating Preliminary Duration of Building Projects. Dans: Journal of Construction Engineering and Management, v. 142, n. 2 (février 2016). (2016):
- Analysis of the Complex Mechanisms of Defect Generation in Construction Projects. Dans: Journal of Construction Engineering and Management, v. 142, n. 2 (février 2016). (2016):
- Minimizing Fluctuation of the Maintenance, Repair, and Rehabilitation Cost Profile of a Building. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 30, n. 3 (juin 2016). (2016):
- Identification and Quantification of Non-Value-Adding Effort from Errors and Changes in Design and Construction Projects. Dans: Journal of Construction Engineering and Management, v. 138, n. 1 (janvier 2012). (2012):
- Improving Accuracy of Early Stage Cost Estimation by Revising Categorical Variables in a Case-Based Reasoning Model. Dans: Journal of Construction Engineering and Management, v. 140, n. 7 (juillet 2014). (2014):