Improving Accuracy of Early Stage Cost Estimation by Revising Categorical Variables in a Case-Based Reasoning Model
Auteur(s): |
RunZhi Jin
Sangwon Han Changtaek Hyun JiHoon Kim |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Construction Engineering and Management, juillet 2014, n. 7, v. 140 |
Page(s): | 04014025 |
DOI: | 10.1061/(asce)co.1943-7862.0000863 |
- Informations
sur cette fiche - Reference-ID
10170339 - Publié(e) le:
02.12.2018 - Modifié(e) le:
02.12.2018