-
Bahreini, Fardin / Nasrollahi, Majid / Taher, Alhusain / Hammad, Amin (2024): Ontology for BIM-Based Robotic Navigation and Inspection Tasks. Dans: Buildings, v. 14, n. 8 (23 juillet 2024).
https://doi.org/10.3390/buildings14082274
-
Ghelmani, Ali / Hammad, Amin (2023): Self-supervised contrastive video representation learning for construction equipment activity recognition on limited dataset. Dans: Automation in Construction, v. 154 (octobre 2023).
https://doi.org/10.1016/j.autcon.2023.105001
-
Bolourian, Neshat / Nasrollahi, Majid / Bahreini, Fardin / Hammad, Amin (2023): Point Cloud–Based Concrete Surface Defect Semantic Segmentation. Dans: Journal of Computing in Civil Engineering, v. 37, n. 2 (mars 2023).
https://doi.org/10.1061/jccee5.cpeng-5009
-
Vahdatikhaki, Faridaddin / Salimzadeh, Negar / Hammad, Amin (2022): Optimization of PV modules layout on high-rise building skins using a BIM-based generative design approach. Dans: Energy and Buildings, v. 258 (mars 2022).
https://doi.org/10.1016/j.enbuild.2021.111787
-
Liu, Chunlu / Hammad, Amin / Itoh, Yoshito (1997): Maintenance Strategy Optimization of Bridge Decks Using Genetic Algorithm. Dans: Journal of Transportation Engineering, v. 123, n. 2 (mars 1997).
https://doi.org/10.1061/(asce)0733-947x(1997)123:2(91)
-
Huang, Yusheng / Hammad, Amin / Zhu, Zhenhua (2021): Providing proximity alerts to workers on construction sites using Bluetooth Low Energy RTLS. Dans: Automation in Construction, v. 132 (décembre 2021).
https://doi.org/10.1016/j.autcon.2021.103928
-
Guévremont, Michel / Hammad, Amin (2021): Ontology for Linking Delay Claims with 4D Simulation to Analyze Effects-Causes and Responsibilities. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 13, n. 4 (novembre 2021).
https://doi.org/10.1061/(asce)la.1943-4170.0000489
-
Genger, Tersoo K. / Luo, Yisha / Hammad, Amin (2021): Multi-criteria spatial analysis for location selection of multi-purpose utility tunnels. Dans: Tunnelling and Underground Space Technology, v. 115 (septembre 2021).
https://doi.org/10.1016/j.tust.2021.104073
-
Guévremont, Michel / Hammad, Amin (2020): Review and Survey of 4D Simulation Applications in Forensic Investigation of Delay Claims in Construction Projects. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 12, n. 3 (août 2020).
https://doi.org/10.1061/(asce)la.1943-4170.0000391
-
Itoh, Yoshito / Hammad, Amin / Liu, Chunlu / Shintoku, Yoji (1997): Network-Level Bridge Life-Cycle Management System. Dans: Journal of Infrastructure Systems, v. 3, n. 1 (mars 1997).
https://doi.org/10.1061/(asce)1076-0342(1997)3:1(31)
-
Hammad, Amin / Shintoku, Yoji / Itoh, Yoshito (1995): New approach toward bridge management database systems. Présenté pendant: IABSE Colloquium: Knowledge Support Systems n Civil Engineering, Bergamo, Italy, 1995.
https://doi.org/10.5169/seals-54666
-
Hammad, Amin / Mabuchi, Seiji / Itoh, Yoshito (1993): Knowledge-based system using graphics and image processing. Présenté pendant: IABSE Colloquium: Knowledge-Based Systems in Civil Engineering, Beijing, China, 1993.
https://doi.org/10.5169/seals-51857
-
Salimzadeh, Negar / Vahdatikhaki, Faridaddin / Hammad, Amin (2020): Parametric modeling and surface-specific sensitivity analysis of PV module layout on building skin using BIM. Dans: Energy and Buildings, v. 216 (juin 2020).
https://doi.org/10.1016/j.enbuild.2020.109953
-
Bolourian, Neshat / Hammad, Amin (2020): LiDAR-equipped UAV path planning considering potential locations of defects for bridge inspection. Dans: Automation in Construction, v. 117 (septembre 2020).
https://doi.org/10.1016/j.autcon.2020.103250
-
Salimi, Shide / Hammad, Amin (2020): Optimizing energy consumption and occupants comfort in open-plan offices using local control based on occupancy dynamic data. Dans: Building and Environment, v. 176 (juin 2020).
https://doi.org/10.1016/j.buildenv.2020.106818
-
Hammad, Amin / Itoh, Yoshito (2008): Knowledge Acquisition for Bridge Design Expert Systems. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 8, n. 3 (novembre 2008).
https://doi.org/10.1111/j.1467-8667.1993.tb00206.x
-
Salimi, Shide / Liu, Zheng / Hammad, Amin (2019): Occupancy prediction model for open-plan offices using real-time location system and inhomogeneous Markov chain. Dans: Building and Environment, v. 152 (avril 2019).
https://doi.org/10.1016/j.buildenv.2019.01.052
-
El Ammari, Khaled / Hammad, Amin (2019): Remote interactive collaboration in facilities management using BIM-based mixed reality. Dans: Automation in Construction, v. 107 (novembre 2019).
https://doi.org/10.1016/j.autcon.2019.102940
-
Mawlana, Mohammed / Hammad, Amin (2019): Integrating Variance Reduction Techniques and Parallel Computing in Construction Simulation Optimization. Dans: Journal of Computing in Civil Engineering, v. 33, n. 4 (juillet 2019).
https://doi.org/10.1061/(asce)cp.1943-5487.0000841
-
Zhang, Cheng / Hammad, Amin (2012): Multiagent Approach for Real-Time Collision Avoidance and Path Replanning for Cranes. Dans: Journal of Computing in Civil Engineering, v. 26, n. 6 (novembre 2012).
https://doi.org/10.1061/(asce)cp.1943-5487.0000181
-
AlBahnassi, Homam / Hammad, Amin (2012): Near Real-Time Motion Planning and Simulation of Cranes in Construction: Framework and System Architecture. Dans: Journal of Computing in Civil Engineering, v. 26, n. 1 (janvier 2012).
https://doi.org/10.1061/(asce)cp.1943-5487.0000123
-
Liu, Chunlu / Hammad, Amin / Itoh, Yoshito (1997): Multiobjective Optimization of Bridge Deck Rehabilitation Using a Genetic Algorithm. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 12, n. 6 (novembre 1997).
https://doi.org/10.1111/0885-9507.00075
-
Hammad, Amin / Zhang, Cheng / Hu, Yongxin / Mozaffari, Elaheh (2006): Mobile Model-Based Bridge Lifecycle Management System. Dans: Computer-Aided Civil and Infrastructure Engineering, v. 21, n. 7 (octobre 2006).
https://doi.org/10.1111/j.1467-8667.2006.00456.x
-
Salimi, Shide / Mawlana, Mohammed / Hammad, Amin (2018): Performance analysis of simulation-based optimization of construction projects using High Performance Computing. Dans: Automation in Construction, v. 87 (mars 2018).
https://doi.org/10.1016/j.autcon.2017.12.003
-
Vahdatikhaki, Faridaddin / Hammad, Amin (2015): Risk-based look-ahead workspace generation for earthwork equipment using near real-time simulation. Dans: Automation in Construction, v. 58 (octobre 2015).
https://doi.org/10.1016/j.autcon.2015.07.019
-
Zhu, Zhenhua / Park, Man-Woo / Koch, Christian / Soltani, Mohamad / Hammad, Amin / Davari, Khashayar (2016): Predicting movements of onsite workers and mobile equipment for enhancing construction site safety. Dans: Automation in Construction, v. 68 (août 2016).
https://doi.org/10.1016/j.autcon.2016.04.009
-
Motamedi, Ali / Hammad, Amin / Asen, Yoosef (2014): Knowledge-assisted BIM-based visual analytics for failure root cause detection in facilities management. Dans: Automation in Construction, v. 43 (juillet 2014).
https://doi.org/10.1016/j.autcon.2014.03.012
-
Vahdatikhaki, Faridaddin / Hammad, Amin / Siddiqui, Hassaan (2015): Optimization-based excavator pose estimation using real-time location systems. Dans: Automation in Construction, v. 56 (août 2015).
https://doi.org/10.1016/j.autcon.2015.03.006
-
Zhang, Cheng / Zayed, Tarek / Hammad, Amin (2008): Resource Management of Bridge Deck Rehabilitation: Jacques Cartier Bridge Case Study. Dans: Journal of Construction Engineering and Management, v. 134, n. 5 (mai 2008).
https://doi.org/10.1061/(asce)0733-9364(2008)134:5(311)
-
Abu Samra, Soliman / Ahmed, Mahmoud / Hammad, Amin / Zayed, Tarek (2018): Multiobjective Framework for Managing Municipal Integrated Infrastructure. Dans: Journal of Construction Engineering and Management, v. 144, n. 1 (janvier 2018).
https://doi.org/10.1061/(asce)co.1943-7862.0001402