Ontology for Linking Delay Claims with 4D Simulation to Analyze Effects-Causes and Responsibilities
Auteur(s): |
Michel Guévremont
Amin Hammad |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, novembre 2021, n. 4, v. 13 |
Page(s): | 04521024 |
DOI: | 10.1061/(asce)la.1943-4170.0000489 |
- Informations
sur cette fiche - Reference-ID
10627441 - Publié(e) le:
05.09.2021 - Modifié(e) le:
05.09.2021