Han-Seong Gwak
- Stochastic Carbon Emission Estimation Method for Construction Operation. Dans: Journal of Civil Engineering and Management, v. 23, n. 1 (janvier 2017). (2017):
- Stochastic Optimal Haul-Route Searching Method Based on Genetic Algorithm and Simulation. Dans: Journal of Computing in Civil Engineering, v. 30, n. 3 (mai 2016). (2016):
- Exact Time–Cost Tradeoff Analysis in Concurrency-Based Scheduling. Dans: Journal of Construction Engineering and Management, v. 142, n. 10 (octobre 2016). (2016):
- Integrated carbon emission estimation method for construction operation and project scheduling. Dans: KSCE Journal of Civil Engineering, v. 20, n. 4 (décembre 2014). (2014):
- Optimal cut-fill pairing and sequencing method in earthwork operation. Dans: Automation in Construction, v. 87 (mars 2018). (2018):
- Eco-economic excavator configuration method. Dans: Automation in Construction, v. 86 (février 2018). (2018):
- Dozer Workability Estimation Method for Economic Dozing. Dans: Journal of Construction Engineering and Management, v. 143, n. 2 (février 2017). (2017):