Han-Seong Gwak
- Stochastic Carbon Emission Estimation Method for Construction Operation. In: Journal of Civil Engineering and Management, v. 23, n. 1 (Januar 2017). (2017):
- Stochastic Optimal Haul-Route Searching Method Based on Genetic Algorithm and Simulation. In: Journal of Computing in Civil Engineering, v. 30, n. 3 (Mai 2016). (2016):
- Exact Time–Cost Tradeoff Analysis in Concurrency-Based Scheduling. In: Journal of Construction Engineering and Management, v. 142, n. 10 (Oktober 2016). (2016):
- Integrated carbon emission estimation method for construction operation and project scheduling. In: KSCE Journal of Civil Engineering, v. 20, n. 4 (Dezember 2014). (2014):
- Optimal cut-fill pairing and sequencing method in earthwork operation. In: Automation in Construction, v. 87 (März 2018). (2018):
- Eco-economic excavator configuration method. In: Automation in Construction, v. 86 (Februar 2018). (2018):
- Dozer Workability Estimation Method for Economic Dozing. In: Journal of Construction Engineering and Management, v. 143, n. 2 (Februar 2017). (2017):