0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Gunduz, Murat / Naser, Ayman (2019): Value Stream Mapping as a Lean Tool for Construction Projects. Dans: International Journal of Structural and Civil Engineering Research, v. 8, n. 1 ( 2019).

    https://doi.org/10.18178/ijscer.8.1.69-74

  2. Gunduz, Murat / Abumoza, Abdulla M. / Aly, Aly Abdelfattah (2022): A structural equation model to assess the effects of strategic and project related potential risks on project delivery in Qatar. Dans: Engineering, Construction and Architectural Management, v. 30, n. 10 (août 2022).

    https://doi.org/10.1108/ecam-04-2022-0343

  3. Gunduz, Murat / Aly, Aly A. / El Mekkawy, Tarek (2022): Value Engineering Factors with an Impact on Design Management Performance of Construction Projects. Dans: Journal of Management in Engineering (ASCE), v. 38, n. 3 (mai 2022).

    https://doi.org/10.1061/(asce)me.1943-5479.0001026

  4. Gunduz, Murat / Abdi, Ebrahim A. (2020): Motivational Factors and Challenges of Cooperative Partnerships between Contractors in the Construction Industry. Dans: Journal of Management in Engineering (ASCE), v. 36, n. 4 (juillet 2020).

    https://doi.org/10.1061/(asce)me.1943-5479.0000773

  5. Gunduz, Murat / Elsherbeny, Hesham A. (2020): Operational Framework for Managing Construction-Contract Administration Practitioners’ Perspective through Modified Delphi Method. Dans: Journal of Construction Engineering and Management, v. 146, n. 3 (mars 2020).

    https://doi.org/10.1061/(asce)co.1943-7862.0001768

  6. Gunduz, Murat (2004): A quantitative approach for evaluation of negative impact of overmanning on electrical and mechanical projects. Dans: Building and Environment, v. 39, n. 5 (mai 2004).

    https://doi.org/10.1016/j.buildenv.2003.11.006

  7. Gunduz, Murat / Nielsen, Yasemin / Ozdemir, Mustafa (2013): Quantification of Delay Factors Using the Relative Importance Index Method for Construction Projects in Turkey. Dans: Journal of Management in Engineering (ASCE), v. 29, n. 2 (avril 2013).

    https://doi.org/10.1061/(asce)me.1943-5479.0000129

  8. Gunduz, Murat / Laitinen, Heikki (2017): Observation based safety performance indexing method for construction industry – validation with SMEs. Dans: KSCE Journal of Civil Engineering, v. 22, n. 2 (juin 2017).

    https://doi.org/10.1007/s12205-017-1589-3

  9. Gunduz, Murat / Simsek, Burak (2007): A strategic safety management framework through balanced scorecard and quality function deployment. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 34, n. 5 (mai 2007).

    https://doi.org/10.1139/l06-163

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine