0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Paul M. Goodrum ORCID

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Nasir, Hassan / Haas, Carl T. / Caldas, Carlos H. / Goodrum, Paul M. (2016): An Integrated Productivity-Practices Implementation Index for Planning the Execution of Infrastructure Projects. Dans: Journal of Infrastructure Systems, v. 22, n. 2 (juin 2016).

    https://doi.org/10.1061/(asce)is.1943-555x.0000275

  2. Minooei, Farzad / Goodrum, Paul M. / Taylor, Timothy R. B. (2020): Young Talent Motivations to Pursue Craft Careers in Construction: The Theory of Planned Behavior. Dans: Journal of Construction Engineering and Management, v. 146, n. 7 (juillet 2020).

    https://doi.org/10.1061/(asce)co.1943-7862.0001867

  3. Jin, Haifeng / Nahangi, Mohammad / Goodrum, Paul M. / Yuan, Yongbo (2020): Multiobjective Optimization for Scaffolding Space Planning in Industrial Piping Construction Using Model-Based Simulation Programming. Dans: Journal of Computing in Civil Engineering, v. 34, n. 1 (janvier 2020).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000861

  4. Shan, Yongwei / Zhai, Dong / Goodrum, Paul M. / Haas, Carl T. / Caldas, Carlos H. (2016): Statistical Analysis of the Effectiveness of Management Programs in Improving Construction Labor Productivity on Large Industrial Projects. Dans: Journal of Management in Engineering (ASCE), v. 32, n. 1 (janvier 2016).

    https://doi.org/10.1061/(asce)me.1943-5479.0000375

  5. Karimi, Hossein / Taylor, Timothy R. B. / Goodrum, Paul M. / Srinivasan, Cidambi (2016): Quantitative analysis of the impact of craft worker availability on construction project safety performance. Dans: Construction Innovation, v. 16, n. 3 (juillet 2016).

    https://doi.org/10.1108/ci-10-2015-0050

  6. Albattah, Mohammed A. / Goodrum, Paul M. / Taylor, Timothy R. B. (2019): New Metric of Workforce Availability among Construction Occupations and Regions. Dans: Practice Periodical on Structural Design and Construction, v. 24, n. 2 (mai 2019).

    https://doi.org/10.1061/(asce)sc.1943-5576.0000413

  7. Allmon, Eric / Haas, Carl T. / Borcherding, John D. / Goodrum, Paul M. (2000): U.S. Construction Labor Productivity Trends, 1970–1998. Dans: Journal of Construction Engineering and Management, v. 126, n. 2 (mars 2000).

    https://doi.org/10.1061/(asce)0733-9364(2000)126:2(97)

  8. Teicholz, Paul / Goodrum, Paul M. / Haas, Carl T. (2001): U.S. Construction Labor Productivity Trends, 1970–1998. Dans: Journal of Construction Engineering and Management, v. 127, n. 5 (octobre 2001).

    https://doi.org/10.1061/(asce)0733-9364(2001)127:5(427)

  9. Caldas, Carlos H. / Kim, Jung-Yeol / Haas, Carl T. / Goodrum, Paul M. / Zhang, Di (2015): Method to Assess the Level of Implementation of Productivity Practices on Industrial Projects. Dans: Journal of Construction Engineering and Management, v. 141, n. 1 (janvier 2015).

    https://doi.org/10.1061/(asce)co.1943-7862.0000919

  10. Goodrum, Paul M. / Haas, Carl T. / Caldas, Carlos / Zhai, Dong / Yeiser, Jordan / Homm, Daniel (2011): Model to Predict the Impact of a Technology on Construction Productivity. Dans: Journal of Construction Engineering and Management, v. 137, n. 9 (septembre 2011).

    https://doi.org/10.1061/(asce)co.1943-7862.0000328

  11. Zhai, Dong / Goodrum, Paul M. / Haas, Carl T. / Caldas, Carlos H. (2009): Relationship between Automation and Integration of Construction Information Systems and Labor Productivity. Dans: Journal of Construction Engineering and Management, v. 135, n. 8 (août 2009).

    https://doi.org/10.1061/(asce)co.1943-7862.0000024

  12. Goodrum, Paul M. / Haas, Carl T. (2002): Partial Factor Productivity and Equipment Technology Change at Activity Level in U.S. Construction Industry. Dans: Journal of Construction Engineering and Management, v. 128, n. 6 (décembre 2002).

    https://doi.org/10.1061/(asce)0733-9364(2002)128:6(463)

  13. Karimi, Hossein / Taylor, Timothy R. B. / Dadi, Gabriel B. / Goodrum, Paul M. / Srinivasan, Cidambi (2018): Impact of Skilled Labor Availability on Construction Project Cost Performance. Dans: Journal of Construction Engineering and Management, v. 144, n. 7 (juillet 2018).

    https://doi.org/10.1061/(asce)co.1943-7862.0001512

  14. Goodrum, Paul M. / Haas, Carl T. (2004): Long-Term Impact of Equipment Technology on Labor Productivity in the U.S. Construction Industry at the Activity Level. Dans: Journal of Construction Engineering and Management, v. 130, n. 1 (février 2004).

    https://doi.org/10.1061/(asce)0733-9364(2004)130:1(124)

  15. Goodrum, Paul M. / Zhai, Dong / Yasin, Mohammed F. (2009): Relationship between Changes in Material Technology and Construction Productivity. Dans: Journal of Construction Engineering and Management, v. 135, n. 4 (avril 2009).

    https://doi.org/10.1061/(asce)0733-9364(2009)135:4(278)

  16. Dai, Jiukun / Goodrum, Paul M. / Maloney, William F. / Srinivasan, Cidambi (2009): Latent Structures of the Factors Affecting Construction Labor Productivity. Dans: Journal of Construction Engineering and Management, v. 135, n. 5 (mai 2009).

    https://doi.org/10.1061/(asce)0733-9364(2009)135:5(397)

  17. Haas, Carl T. / Rodriguez, Ana Maria / Glover, Robert / Goodrum, Paul M. (2001): Implementing a multiskilled workforce. Dans: Construction Management and Economics, v. 19, n. 6 (octobre 2001).

    https://doi.org/10.1080/01446190110050936

  18. Goodrum, Paul M. / Gangwar, Manish (2004): The relationship between changes in equipment technology and wages in the US construction industry. Dans: Construction Management and Economics, v. 22, n. 3 (mars 2004).

    https://doi.org/10.1080/0144619032000116543

  19. Jones, Timothy / Shan, Yongwei / Goodrum, Paul M. (2010): An investigation of corporate approaches to sustainability in the US engineering and construction industry. Dans: Construction Management and Economics, v. 28, n. 9 (septembre 2010).

    https://doi.org/10.1080/01446191003789465

  20. Albattah, Mohammed / Shan, Yongwei / Goodrum, Paul M. / Taylor, Timothy R. B. (2017): Relationships between cycles of economic expansion in construction and craft workers' job satisfaction and preferences. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 44, n. 1 (janvier 2017).

    https://doi.org/10.1139/cjce-2016-0358

  21. Goodrum, Paul M. / Miller, Jeffrey / Sweany, John / Alruwaythi, Omar (2016): Influence of the Format of Engineering Information and Spatial Cognition on Craft-Worker Performance. Dans: Journal of Construction Engineering and Management, v. 142, n. 9 (septembre 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001157

  22. Shan, Yongwei / Goodrum, Paul M. / Zhai, Dong / Haas, Carl / Caldas, Carlos H. (2011): The impact of management practices on mechanical construction productivity. Dans: Construction Management and Economics, v. 29, n. 3 (mars 2011).

    https://doi.org/10.1080/01446193.2010.538070

  23. Shan, Yongwei / Kim, Jung Yeol / Goodrum, Paul M. / Caldas, Carlos H. / Haas, Carl (2014): Impact of steel quick connection system on steel erection labor productivity: case studies and simulation based analyses. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 41, n. 12 (décembre 2014).

    https://doi.org/10.1139/cjce-2014-0079

  24. Dadi, Gabriel B. / Taylor, Timothy R. B. / Goodrum, Paul M. / Maloney, William F. (2014): Performance of 3D computers and 3D printed models as a fundamental means for spatial engineering information visualization. Dans: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 41, n. 10 (octobre 2014).

    https://doi.org/10.1139/cjce-2014-0019

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine