Mario Galli
- Residual water content of excavated soil in EPB tunnelling. Dans: Tunnelling and Underground Space Technology, v. 114 (août 2021). (2021):
- Erneuerung Kuckuckslay Tunnel – Aktuelle Erfahrungen beim Einsatz der Tunnel‐im‐Tunnel‐Methode. Dans: Geomechanics and Tunnelling, v. 13, n. 5 (octobre 2020). (2020):
- Rheological Characterisation of Foam-Conditioned Sands in EPB Tunneling. Dans: International Journal of Civil Engineering, v. 17, n. 1 (juin 2019). (2019):
- Why were 800 m of the Boßler Tunnel built twice? - TBM passing a shotcrete section. Dans: Geomechanics and Tunnelling, v. 10, n. 2 (avril 2017). (2017):
- An interaction platform for mechanized tunnelling / Eine Interaktionsplattform für maschinelle Tunnelvortriebe. Application on the Wehrhahn-Line in Düsseldorf (Germany) / Anwendung am Beispiel der Wehrhahn-Linie in Düsseldorf. Dans: Geomechanics and Tunnelling, v. 7, n. 1 ( 2014). (2014):
- Investigations for the application of EPB shields in difficult grounds / Untersuchungen für den Einsatz von Erddruckschilden in schwierigem Baugrund. Dans: Geomechanics and Tunnelling, v. 7, n. 1 ( 2014). (2014):