Mounir El Asmar ORCID

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Aramali, Vartenie / Gibson, G. Edward / El Asmar, Mounir / Sanboskani, Hala (2023): Novel Earned Value Management System Maturity Framework and Its Relation to Project Performance. Dans: Journal of Construction Engineering and Management, v. 149, n. 6 (juin 2023).

    https://doi.org/10.1061/jcemd4.coeng-12985

  2. Gibson, G. Edward / El Asmar, Mounir / Yussef, Abdulrahman / Ramsey, David (2023): A novel approach for measuring the accuracy of front end engineering design. Dans: Engineering, Construction and Architectural Management, v. 31, n. 7 (avril 2023).

    https://doi.org/10.1108/ecam-05-2022-0418

  3. Franz, Bryan / Leicht, Robert / El Asmar, Mounir / Molenaar, Keith (2022): Methodological Consistency for Quantitative Analysis and Reporting in Project Delivery System Performance Research. Dans: Journal of Construction Engineering and Management, v. 148, n. 9 (septembre 2022).

    https://doi.org/10.1061/(asce)co.1943-7862.0002338

  4. Feghaly, Jeffrey / El Asmar, Mounir / Ariaratnam, Samuel / Bearup, Wylie (2020): Selecting project delivery methods for water treatment plants. Dans: Engineering, Construction and Architectural Management, v. 27, n. 4 ( 2020).

    https://doi.org/10.1108/ecam-06-2019-0308

  5. Azar, Elie / O'Brien, William / Carlucci, Salvatore / Hong, Tianzhen / Sonta, Andrew / Kim, Joyce / Andargie, Maedot S. / Abuimara, Tareq / El Asmar, Mounir / Jain, Rishee K. / Ouf, Mohamed M. / Tahmasebi, Farhang / Zhou, Jin (2020): Simulation-aided occupant-centric building design: A critical review of tools, methods, and applications. Dans: Energy and Buildings, v. 224 (octobre 2020).

    https://doi.org/10.1016/j.enbuild.2020.110292

  6. Feghaly, Jeffrey / El Asmar, Mounir / Ariaratnam, Samuel T. (2020): State of Professional Practice for Water Infrastructure Project Delivery. Dans: Practice Periodical on Structural Design and Construction, v. 25, n. 3 (août 2020).

    https://doi.org/10.1061/(asce)sc.1943-5576.0000500

  7. El Asmar, Mounir / Lokanath, Sumanth V. / El Asmar, Lucien / Abella, Ferdinand / Chokor, Abbas (2020): Performance Assessment of Steel Posts Supporting Solar Energy Infrastructure Facilities: Novel Approach for Underground Corrosion. Dans: Journal of Performance of Constructed Facilities (ASCE), v. 34, n. 3 (juin 2020).

    https://doi.org/10.1061/(asce)cf.1943-5509.0001436

  8. Papajohn, Dean / El Asmar, Mounir (2020): Percent Base Design and Initial Award Performance in Design–Build Highway Projects. Dans: Journal of Management in Engineering (ASCE), v. 36, n. 3 (mai 2020).

    https://doi.org/10.1061/(asce)me.1943-5479.0000759

  9. Yussef, Abdulrahman / Gibson, G. Edward / El Asmar, Mounir / Ramsey, David (2019): Quantifying FEED Maturity and Its Impact on Project Performance in Large Industrial Projects. Dans: Journal of Management in Engineering (ASCE), v. 35, n. 5 (septembre 2019).

    https://doi.org/10.1061/(asce)me.1943-5479.0000702

  10. Francom, Tober / El Asmar, Mounir / Ariaratnam, Samuel T. (2016): Performance Analysis of Construction Manager at Risk on Pipeline Engineering and Construction Projects. Dans: Journal of Management in Engineering (ASCE), v. 32, n. 6 (novembre 2016).

    https://doi.org/10.1061/(asce)me.1943-5479.0000456

  11. El Asmar, Mounir / Lotfallah, Wafik Boulos / Loh, Wei-Yin / Hanna, Awad S. (2012): Uncertainty Reduction in Multi-Evaluator Decision Making. Dans: Journal of Computing in Civil Engineering, v. 26, n. 1 (janvier 2012).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000119

  12. El Asmar, Mounir / Lotfallah, Wafik Boulos / Loh, Wei-Yin / Hanna, Awad S. (2013): Reducing Bias and Uncertainty in Multievaluator Multicriterion Decision Making. Dans: Journal of Computing in Civil Engineering, v. 27, n. 2 (mars 2013).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000206

  13. Sullivan, Jera / El Asmar, Mounir / Chalhoub, Jad / Obeid, Hassan (2017): Two Decades of Performance Comparisons for Design-Build, Construction Manager at Risk, and Design-Bid-Build: Quantitative Analysis of the State of Knowledge on Project Cost, Schedule, and Quality. Dans: Journal of Construction Engineering and Management, v. 143, n. 6 (juin 2017).

    https://doi.org/10.1061/(asce)co.1943-7862.0001282

  14. El Asmar, Mounir / Hanna, Awad S. / Whited, Gary C. (2011): New Approach to Developing Conceptual Cost Estimates for Highway Projects. Dans: Journal of Construction Engineering and Management, v. 137, n. 11 (novembre 2011).

    https://doi.org/10.1061/(asce)co.1943-7862.0000355

  15. El Asmar, Mounir / Hanna, Awad S. / Loh, Wei-Yin (2013): Quantifying Performance for the Integrated Project Delivery System as Compared to Established Delivery Systems. Dans: Journal of Construction Engineering and Management, v. 139, n. 11 (novembre 2013).

    https://doi.org/10.1061/(asce)co.1943-7862.0000744

  16. Francom, Tober C. / El Asmar, Mounir (2015): Project Quality and Change Performance Differences Associated with the Use of Building Information Modeling in Design and Construction Projects: Univariate and Multivariate Analyses. Dans: Journal of Construction Engineering and Management, v. 141, n. 9 (septembre 2015).

    https://doi.org/10.1061/(asce)co.1943-7862.0000992

  17. Hanna, Awad / Boodai, Fawaz / El Asmar, Mounir (2013): State of Practice of Building Information Modeling in Mechanical and Electrical Construction Industries. Dans: Journal of Construction Engineering and Management, v. 139, n. 10 (octobre 2013).

    https://doi.org/10.1061/(asce)co.1943-7862.0000747

  18. El Asmar, Mounir / Hanna, Awad S. / Chang, Chul-Ki (2009): Monte Carlo Simulation Approach to Support Alliance Team Selection. Dans: Journal of Construction Engineering and Management, v. 135, n. 10 (octobre 2009).

    https://doi.org/10.1061/(asce)co.1943-7862.0000074

  19. El Asmar, Mounir / Lotfallah, Wafik / Whited, Gary / Hanna, Awad S. (2010): Quantitative Methods for Design-Build Team Selection. Dans: Journal of Construction Engineering and Management, v. 136, n. 8 (août 2010).

    https://doi.org/10.1061/(asce)co.1943-7862.0000194

  20. Chokor, Abbas / El Asmar, Mounir / Sai Paladugu, Bala (2017): Quantifying the Impact of Cost-Based Incentives on the Performance of Building Projects in the United States. Dans: Practice Periodical on Structural Design and Construction, v. 22, n. 2 (mai 2017).

    https://doi.org/10.1061/(asce)sc.1943-5576.0000312

  21. Ramsey, David / El Asmar, Mounir / Gibson, G. Edward (2016): Quantitative Performance Assessment of Single-Step versus Two-Step Design-Build Procurement. Dans: Journal of Construction Engineering and Management, v. 142, n. 9 (septembre 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001145

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine