Islam H. El-adaway ORCID

La bibliographie suivante contient toutes les publications répertoriées dans la base de données qui sont reliées à ce nom en tant qu'auteur, éditeur ou collaborateur.

  1. Shiha, Ahmed / El-adaway, Islam H. (2024): Forecasting Construction Material Prices Using Macroeconomic Indicators of Trading Partners. Dans: Journal of Management in Engineering (ASCE), v. 40, n. 5 (septembre 2024).

    https://doi.org/10.1061/jmenea.meeng-6106

  2. Khalef, Ramy / El-adaway, Islam H. (2024): Investigating Causes of Disputes Resulting in Litigation in Airport Development Projects in the United States Using Graph-Based Techniques. Dans: Journal of Management in Engineering (ASCE), v. 40, n. 3 (mai 2024).

    https://doi.org/10.1061/jmenea.meeng-5903

  3. Abdul Nabi, Mohamad / El-adaway, Islam H. / Assaad, Rayan H. (2024): Modeling Inflation Transmission among Different Construction Materials. Dans: Journal of Construction Engineering and Management, v. 150, n. 5 (mai 2024).

    https://doi.org/10.1061/jcemd4.coeng-13893

  4. Abdul Nabi, Mohamad / Assaad, Rayan H. / El-adaway, Islam H. (2024): Modeling and Understanding Dispute Causation in the US Public–Private Partnership Projects. Dans: Journal of Infrastructure Systems, v. 30, n. 1 (mars 2024).

    https://doi.org/10.1061/jitse4.iseng-2328

  5. Ahmed, Muaz O. / El-adaway, Islam H. (2022): An integrated game-theoretic and reinforcement learning modeling for multi-stage construction and infrastructure bidding. Dans: Construction Management and Economics, v. 41, n. 3 (novembre 2022).

    https://doi.org/10.1080/01446193.2022.2124528

  6. Khalef, Ramy / El-adaway, Islam H. (2023): Identifying Design-Build Decision-Making Factors and Providing Future Research Guidelines: Social Network and Association Rule Analysis. Dans: Journal of Construction Engineering and Management, v. 149, n. 1 (janvier 2023).

    https://doi.org/10.1061/(asce)co.1943-7862.0002431

  7. Assaad, Rayan H. / El-adaway, Islam H. / Hastak, Makarand / Needy, Kim LaScola (2023): Key Factors Affecting Labor Productivity in Offsite Construction Projects. Dans: Journal of Construction Engineering and Management, v. 149, n. 1 (janvier 2023).

    https://doi.org/10.1061/jcemd4.coeng-12654

  8. Ali, Gasser G. / El-adaway, Islam H. / Sims, Charles / Holladay, J. Scott / Chen, Chien-fei (2022): Policies and Incentives for Promoting Distributed Solar Generation: Impact on Electric Power Infrastructure. Dans: Journal of Infrastructure Systems, v. 28, n. 4 (décembre 2022).

    https://doi.org/10.1061/(asce)is.1943-555x.0000714

  9. Mutikanga, Harrison E. / Abdul Nabi, Mohamad / Ali, Gasser G. / El-adaway, Islam H. / Caldwell, Aubrie (2022): Postaward Construction and Contract Management of Engineering, Procurement, and Construction Hydropower Projects: Two Case Studies from Uganda. Dans: Journal of Management in Engineering (ASCE), v. 38, n. 6 (novembre 2022).

    https://doi.org/10.1061/(asce)me.1943-5479.0001088

  10. Assaad, Rayan H. / El-adaway, Islam H. / Hastak, Makarand / Needy, Kim LaScola (2022): The Impact of Offsite Construction on the Workforce: Required Skillset and Prioritization of Training Needs. Dans: Journal of Construction Engineering and Management, v. 148, n. 7 (juillet 2022).

    https://doi.org/10.1061/(asce)co.1943-7862.0002314

  11. Abdul Nabi, Mohamad / El-adaway, Islam H. (2022): A Proactive Risk Assessment Framework to Maximize Schedule Benefits of Modularization in Construction Projects. Dans: Journal of Construction Engineering and Management, v. 148, n. 7 (juillet 2022).

    https://doi.org/10.1061/(asce)co.1943-7862.0002311

  12. Khalef, Ramy / Ali, Gasser G. / El-adaway, Islam H. / Gad, Ghada M. (2022): Managing construction projects impacted by the COVID-19 pandemic: a contractual perspective. Dans: Construction Management and Economics, v. 40, n. 4 (février 2022).

    https://doi.org/10.1080/01446193.2022.2031238

  13. Assaad, Rayan H. / Ahmed, Muaz O. / El-adaway, Islam H. / Shrestha, Pramen P. (2022): Management of Change Orders in Infrastructure Transportation Projects. Dans: Practice Periodical on Structural Design and Construction, v. 27, n. 1 (février 2022).

    https://doi.org/10.1061/(asce)sc.1943-5576.0000640

  14. Ali, Gasser G. / Khalef, Ramy / El-adaway, Islam H. / Eid, Mohamed / Kahle, Troy / Funke, Cassandra / Vaupel, Martin / Nault, Austin (2021): Joint Venture Agreements for Construction and Professional Services: Comparative Contractual Analysis and Guidelines. Dans: Journal of Management in Engineering (ASCE), v. 37, n. 4 (juillet 2021).

    https://doi.org/10.1061/(asce)me.1943-5479.0000940

  15. Fawzy, Salwa A. / El-adaway, Islam H. (2015): Global Total Cost Claims within Common Law Legal Systems: Application to the World Bank Contract. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 7, n. 2 (mai 2015).

    https://doi.org/10.1061/(asce)la.1943-4170.0000155

  16. LaBarre, Philip S. / El-adaway, Islam H. (2014): Project Benchmarking: Tool for Mitigating Conflicts, Claims, and Disputes through Improved Performance. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 6, n. 1 (février 2014).

    https://doi.org/10.1061/(asce)la.1943-4170.0000140

  17. El-adaway, Islam H. (2010): Integrated Project Delivery Case Study: Guidelines for Drafting Partnering Contract. Dans: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 2, n. 4 (novembre 2010).

    https://doi.org/10.1061/(asce)la.1943-4170.0000024

  18. Elsayegh, Amr / El-adaway, Islam H. (2021): Holistic Study and Analysis of Factors Affecting Collaborative Planning in Construction. Dans: Journal of Construction Engineering and Management, v. 147, n. 4 (avril 2021).

    https://doi.org/10.1061/(asce)co.1943-7862.0002031

  19. Assaad, Rayan / El-adaway, Islam H. (2021): Guidelines for Responding to COVID-19 Pandemic: Best Practices, Impacts, and Future Research Directions. Dans: Journal of Management in Engineering (ASCE), v. 37, n. 3 (mai 2021).

    https://doi.org/10.1061/(asce)me.1943-5479.0000906

  20. El-adaway, Islam H. / Sims, Charles / Eid, Mohamed S. / Liu, Yinan / Ali, Gasser G. (2020): Preliminary Attempt toward Better Understanding the Impact of Distributed Energy Generation: An Agent-Based Computational Economics Approach. Dans: Journal of Infrastructure Systems, v. 26, n. 1 (mars 2020).

    https://doi.org/10.1061/(asce)is.1943-555x.0000527

  21. Assaad, Rayan / El-adaway, Islam H. (2021): Impact of Dynamic Workforce and Workplace Variables on the Productivity of the Construction Industry: New Gross Construction Productivity Indicator. Dans: Journal of Management in Engineering (ASCE), v. 37, n. 1 (janvier 2021).

    https://doi.org/10.1061/(asce)me.1943-5479.0000862

  22. Abdul Nabi, Mohamad / El-adaway, Islam H. (2020): Modular Construction: Determining Decision-Making Factors and Future Research Needs. Dans: Journal of Management in Engineering (ASCE), v. 36, n. 6 (novembre 2020).

    https://doi.org/10.1061/(asce)me.1943-5479.0000859

  23. Assaad, Rayan / El-adaway, Islam H. / Abotaleb, Ibrahim S. (2020): Predicting Project Performance in the Construction Industry. Dans: Journal of Construction Engineering and Management, v. 146, n. 5 (mai 2020).

    https://doi.org/10.1061/(asce)co.1943-7862.0001797

  24. Abotaleb, Ibrahim S. / El-adaway, Islam H. / Moussa, Mohamed B. (2019): Guidelines for Administrating and Drafting Nonpayment Owners' Obligation Provisions under Design-Build Contracts. Dans: Journal of Management in Engineering (ASCE), v. 35, n. 4 (juillet 2019).

    https://doi.org/10.1061/(asce)me.1943-5479.0000693

  25. Abotaleb, Ibrahim S. / El-adaway, Islam H. (2018): Managing Construction Projects through Dynamic Modeling: Reviewing the Existing Body of Knowledge and Deriving Future Research Directions. Dans: Journal of Management in Engineering (ASCE), v. 34, n. 6 (novembre 2018).

    https://doi.org/10.1061/(asce)me.1943-5479.0000633

  26. Boz, Mehmet A. / El-adaway, Islam H. (2014): Managing Sustainability Assessment of Civil Infrastructure Projects Using Work, Nature, and Flow. Dans: Journal of Management in Engineering (ASCE), v. 30, n. 5 (septembre 2014).

    https://doi.org/10.1061/(asce)me.1943-5479.0000203

  27. El-adaway, Islam H. / Truax, Dennis D. (2014): Managing the LEED Analysis for the New Civil and Environmental Engineering Complex at Mississippi State University. Dans: Journal of Management in Engineering (ASCE), v. 30, n. 3 (mai 2014).

    https://doi.org/10.1061/(asce)me.1943-5479.0000171

  28. El-adaway, Islam H. (2012): Insurance Pricing for Windstorm-Susceptible Developments: Bootstrapping Approach. Dans: Journal of Management in Engineering (ASCE), v. 28, n. 2 (avril 2012).

    https://doi.org/10.1061/(asce)me.1943-5479.0000088

  29. Eid, Mohamed S. / El-adaway, Islam H. (2017): Integrating the Social Vulnerability of Host Communities and the Objective Functions of Associated Stakeholders during Disaster Recovery Processes Using Agent-Based Modeling. Dans: Journal of Computing in Civil Engineering, v. 31, n. 5 (septembre 2017).

    https://doi.org/10.1061/(asce)cp.1943-5487.0000680

  30. El-adaway, Islam H. / Kandil, Amr A. (2010): Multiagent System for Construction Dispute Resolution (MAS-COR). Dans: Journal of Construction Engineering and Management, v. 136, n. 3 (mars 2010).

    https://doi.org/10.1061/(asce)co.1943-7862.0000144

Rechercher une publication...

Disponible seulement avec
Mon Structurae

Texte intégral
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine