First Attempt Toward a Holistic Understanding of the Interdependent Rippled Impacts Associated with Out-of-Sequence Work in Construction Projects: System Dynamics Modeling Approach
Auteur(s): |
Ibrahim S. Abotaleb
Islam H. El-adaway |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Construction Engineering and Management, septembre 2018, n. 9, v. 144 |
Page(s): | 04018084 |
DOI: | 10.1061/(asce)co.1943-7862.0001539 |
- Informations
sur cette fiche - Reference-ID
10174882 - Publié(e) le:
11.12.2018 - Modifié(e) le:
11.12.2018